QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.
Distribution / Sites / Customer

UNITED UTILITIES WATER LTD

Customer named in the DNOs’ registers

In SPEN’s September 2026 and ENWL’s October 2026 editions

The registers spell this customer’s name more than one way: “UNITED UTILITIES WATER LTD” (23 sites) and “United Utilities Water Plc” (2 sites).

25sites of 1 MW and over
70.2 MWcapacity
70.2 MWconnected (25 sites)
–accepted to connect (0 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
SPENSeptember 2026 edition213.2 MW13.2 MW–
ENWLOctober 2026 edition2357 MW57 MW–

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Gas and other fossil926.2 MW26.2 MW–
Solar1024.4 MW24.4 MW–
Bioenergy and waste619.6 MW19.6 MW–

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs’ latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
PEEL INDUSTRIAL ESTATE, CHAMBERHALL STREETENWLCARRINGTON ENWL SGTS 1B 2B 4 7Bioenergy and wasteConnected12.1
HuntingtonSPENCapenhurstGas and other fossilConnected11.9
LOSTOCK WATER TREATMENT PLANTENWLKEARSLEY 132 GSPSolarConnected4.54
BURY WWTWENWLKEARSLEY 132 GSPSolarConnected3.864
WIGAN ETWENWLWASHWAY FARM GSP / KIRKBY GSP GROUPSolarConnected3.12
GODLEY WATER TREATMENT WORKSENWLSTALYBRIDGE GSPSolarConnected2.991
FRANKLAW TREATMENT WORKSENWLPENWORTHAM EAST GSP / ROCHDALE SGT 1 GROUPGas and other fossilConnected2.8
SCHOLA GREEN SPSENWLHEYSHAM GSPGas and other fossilConnected2.8
NORTH LONSDALE ROADENWLBREDBURY GSPSolarConnected2.399
LEIGH WWTWENWLKEARSLEY 132 GSPGas and other fossilConnected2.34

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
CARRINGTON ENWL SGTS 1B 2B 4 7ENWL213.3 MW–
CapenhurstSPEN111.9 MW–
KEARSLEY 132 GSPENWL310.7 MW–
HARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUPENWL45.1 MW–
PENWORTHAM EAST GSP / ROCHDALE SGT 1 GROUPENWL24.8 MW–
HEYSHAM GSPENWL24.4 MW–
WASHWAY FARM GSP / KIRKBY GSP GROUPENWL24.4 MW–
STALYBRIDGE GSPENWL13 MW–
PENWORTHAM WEST GSP / STANAH GSP GROUPENWL22.8 MW–
BREDBURY GSPENWL12.4 MW–

What changed recently

Changes to its sites found in both editions of each pair, newest first.

SPEN, August 2026 edition to September 2026 edition, for this customer’s sites: 2 sites matched. Every August site and every September site had a match in the other edition.

ENWL, September 2026 edition to October 2026 edition, for this customer’s sites: 23 sites matched. Every September site and every October site had a match in the other edition.

No change to any detail QueueWatch tracks for its sites so far.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?