PEEL INDUSTRIAL ESTATE, CHAMBERHALL STREET

UNITED UTILITIES WATER LTD at CARRINGTON ENWL SGTS 1B 2B 4 7

ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Aug 2010
Status
Connected
Customer
UNITED UTILITIES WATER LTD
Site name
PEEL INDUSTRIAL ESTATE, CHAMBERHALL STREET
Address
RIVERS LANE, URMSTON, MANCHESTER, GREATER MANCHESTER, M41 7JB
Grid reference
Easting 376053, northing 396385
Licence area
North West England (ENWL)
Grid supply point
CARRINGTON ENWL SGTS 1B 2B 4 7
Bulk supply point
BARTON
Primary substation
DAVYHULME
Connection voltage
6.6 kV
Technology group
Bioenergy and waste
Energy source 1
BIOFUEL - LANDFILL GAS, ENGINE (COMBUSTION / RECIPROCATING): 12.1 MW registered
Registered capacity
12.1 MW
Maximum export capacity
8.701 MW
Maximum import capacity
8.701 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
1640000035286
Import MPAN
1620000370738
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at CARRINGTON ENWL SGTS 1B 2B 4 7

GSP view

15 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 212 MW: 156 MW connected, 56 MW accepted to connect.

  • CARRINGTON STORCARRINGTON GENERATION LTD, Gas and other fossilConnected40 MW
  • CARRINGTON PAPER MILLSAICA PAPER UK LIMITED, Gas and other fossilConnected37.5 MW
  • WILD FOWL FARMLOG 2 LTD, StorageAccepted35 MW
  • MANCHESTER ROAD STORUK POWER RESERVE PEEL, Gas and other fossilConnected20 MW
  • TAYLOR ROADALKANE ENERGY UK LTD, Gas and other fossil, TO BE CONFIRMED primaryAccepted19.848 MW
  • MARTENS ROAD STORUK POWER RESERVE MARTENS ROAD, Gas and other fossilConnected18 MW
  • 4 BROADWAYCARGILL PLC, Gas and other fossil, TRAFFORD PARK NORTH primaryConnected14 MW
  • CITY HOUSEVIRGIN MEDIA LIMITED, Gas and other fossil, BAGULEY primaryConnected6.2 MW

See all 15

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose