BURY WWTW

UNITED UTILITIES WATER LTD at KEARSLEY 132 GSP

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
8 Oct 2020
Status
Connected
Customer
UNITED UTILITIES WATER LTD
Site name
BURY WWTW
Address
CROSSFIELD STREET, BURY, GREATER MANCHESTER, BL9 9TF
Grid reference
Easting 380403, northing 408028
Licence area
North West England (ENWL)
Grid supply point
KEARSLEY 132 GSP
Bulk supply point
BURY
Primary substation
DUMERS LANE
Connection voltage
11 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 2.8 MW registered
Energy source 2
BIOFUEL - LANDFILL GAS, ENGINE (COMBUSTION / RECIPROCATING): 1.064 MW registered
Registered capacity
3.864 MW
Maximum export capacity
3.1 MW
Maximum import capacity
2.09 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
1620000370524
Import MPAN
1620000370524
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at KEARSLEY 132 GSP

GSP view

26 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 246 MW: 151 MW connected, 95 MW accepted to connect.

  • COAL PIT LANEPULSE CLEAN ENERGY, StorageConnected30 MW
  • SLACK LANEFPC ELECTRIC LAND, StorageAccepted30 MW
  • BARKERS FARMSTOR 125 LTD, Gas and other fossilAccepted21.053 MW
  • LASCAR WORKSStorageConnected20 MW
  • LONGLEY LANEBURY POWER LIMITED, Gas and other fossilConnected19.8 MW
  • BURY STOR 1IRWELL POWER LIMITED, Gas and other fossilConnected16 MW
  • AGECROFTELECTRICITY NORTH WEST (CONSTRUCTION & MAINTENANCE) LTD, Gas and other fossilConnected15.789 MW
  • SLACK LANE, WESTHOUGHTONELECTRICITY NORTH WEST (CONSTRUCTION & MAINTENANCE) LTD, StorageAccepted15.789 MW

See all 26

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?