BICKERSTAFFE WTW

UNITED UTILITIES WATER LTD at WASHWAY FARM GSP / KIRKBY GSP GROUP

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Jun 2015
Status
Connected
Customer
UNITED UTILITIES WATER LTD
Site name
BICKERSTAFFE WTW
Address
SIMONSWOOD LANE, BICKERSTAFFE, ORMSKIRK, LANCASHIRE, L39 0ER
Grid reference
Easting 341963, northing 403782
Licence area
North West England (ENWL)
Grid supply point
WASHWAY FARM GSP / KIRKBY GSP GROUP
Bulk supply point
SKELMERSDALE
Primary substation
ORMSKIRK
Connection voltage
11 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 1.25 MW registered
Registered capacity
1.25 MW
Maximum export capacity
0.238 MW
Maximum import capacity
1.058 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
1640000155483
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at WASHWAY FARM GSP / KIRKBY GSP GROUP

GSP view

17 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 278 MW: 132 MW connected, 146 MW accepted to connect.

  • ORRELL BESSUKGEA 1 LIMITED, StorageAccepted70 MW
  • ORRELL BESSCORIOLIS ENERGY, StorageAccepted52.526 MW
  • STEELPOINT BESSAMBER ENERGY STORAGE XL LIMITED, StorageConnected49.9 MW
  • PIMBO ROADPIMBO GENERATION LIMITED, Gas and other fossilConnected21.052 MW
  • STANLEY WAY GENERATIONMY POWER UK, Gas and other fossil, SKELMERSDALE primaryConnected20.28 MW
  • SEFTON RDHERO FUTURE ENERGIES GLOBAL LIMITED, StorageAccepted20 MW
  • BLAGUEGATE WORKSUTILITY ENGINEERING SOLUTIONS LTD, Gas and other fossil, SKELMERSDALE primaryConnected7.952 MW
  • PADDOCK ROADSCA HYGIENE PRODUCTS UK LIMITED, Gas and other fossil, PRIVATE SUBSTATION primaryConnected6.3 MW

See all 17

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?