Data sources and licences
QueueWatch shows data from NESO’s Transmission Entry Capacity (TEC) register and the six DNOs’ Embedded Capacity Registers, and planning data from the Planning Inspectorate and DESNZ’s Renewable Energy Planning Database. Each is listed here with who publishes it, the licence QueueWatch uses it under and a link to it.
QueueWatch is not affiliated with NESO, any transmission owner, any DNO, the Planning Inspectorate or DESNZ.
NESO, Transmission Entry Capacity (TEC) register
Published by the National Energy System Operator (NESO): the register on its data portal.
Licence: National Energy SO Open Data Licence v1.0. Supported by National Energy SO Open Data.
Registers from 29 January 2021 to 11 August 2026 are copies NESO released to QueueQuant on 19 October 2026 under the Environmental Information Regulations 2004 (request FOI/26/226). Registers from 14 August 2026 are the ones QueueWatch downloaded from NESO’s Data Portal.
The Planning Inspectorate, National Infrastructure Projects
Published by the Planning Inspectorate: the list of projects on its website.
Licence: Open Government Licence v3.0. Contains public sector information licensed under the Open Government Licence v3.0.
QueueWatch shows the planning stage of the projects in this list it matches to projects in the TEC register and to sites in the DNOs’ Embedded Capacity Registers, and planning decisions read on the Planning Inspectorate’s pages for projects.
DESNZ, Renewable Energy Planning Database (REPD)
Published by the Department for Energy Security and Net Zero (DESNZ): the quarterly extract on GOV.UK.
Licence: Open Government Licence v3.0. Contains public sector information licensed under the Open Government Licence v3.0.
QueueWatch shows the planning decision or stage, and the Contracts for Difference allocation round, of the records in this database it matches to projects in the TEC register and to sites in the DNOs’ Embedded Capacity Registers.
How QueueWatch matches projects to planning records
QueueWatch compares each project in NESO’s TEC register, and each site of 1 MW and over in the six DNOs’ Embedded Capacity Registers, with the records in DESNZ’s Renewable Energy Planning Database and the Planning Inspectorate’s list of generating stations. It compares name, technology, country, capacity, company and planning reference, and for a site its postcode and grid reference too. Its strongest candidates are records whose names closely agree, that have at least one technology in common, that are in the same country (Scotland, or England and Wales) unless the project is offshore, where at least one other detail also agrees (such as a capacity within 15%, the same company, the same planning reference or, for a site, a location within 2 km), and where no other record fits as well. No match appears until it has been checked, either by hand or by an independent review of both records, and a few are taken by hand from the Planning Inspectorate’s own project pages. A project or site with no matched record may still have planning permission, and if you spot a wrong match, please email info@queuequant.com.
UK Power Networks, Embedded Capacity Register 2 – 1MW and above
Published by UK Power Networks: the register on its data portal.
Licence: CC BY 4.0.
QueueWatch shows this register’s sites of 1 MW and over in its own layout.
Office for National Statistics licensed under the Open Government Licence v.3.0
Contains OS data © Crown copyright and database right [2019-]
National Grid Electricity Distribution, Embedded Capacity Register
Published by National Grid Electricity Distribution (NGED): the register on its data portal.
Licence: as published on NGED’s dataset page.
Scottish and Southern Electricity Networks, Embedded Capacity Register
Published by SSEN Distribution: the register on its data portal.
Licence: CC BY 4.0.
QueueWatch shows this register’s sites of 1 MW and over in its own layout.
SP Energy Networks, Embedded Capacity Register >1MW
Published by SP Energy Networks: the register on its data portal.
Licence: CC BY 4.0.
QueueWatch shows this register’s sites of 1 MW and over in its own layout.
Northern Powergrid, Embedded Capacity Register 1MW and Over
Published by Northern Powergrid: the register on its data portal.
Licence: Northern Powergrid Open Data Licence v1.0. Supported by Northern Powergrid Open Data.
Office for National Statistics licensed under the Open Government Licence v.3.0
Contains OS data © Crown copyright and database right [2019-]
Northern Powergrid, National ECR Archive
Published by Northern Powergrid: the register on its data portal.
Licence: Northern Powergrid Open Data Licence v1.0. Supported by Northern Powergrid Open Data.
Part of Northern Powergrid’s National Embedded Capacity Register (ECR) dataset, which credits UKPN, SSEN, SPEN, NGED and ENW. QueueWatch reads it only for the history charts on the DNOs’ pages, for months a DNO’s own files do not cover.
Office for National Statistics licensed under the Open Government Licence v.3.0
Contains OS data © Crown copyright and database right [2019-]
Electricity North West, Embedded Capacity Register 2 – 1MW and above
Published by Electricity North West (SP Electricity North West): the register on its data portal.
Licence: CC BY 4.0.
QueueWatch shows this register’s sites of 1 MW and over in its own layout.
How to cite QueueWatch and QueueQuant
You’re welcome to quote our figures, charts and findings with this credit.
For a QueueWatch page:
QueueWatch by QueueQuant, ‘[the page’s title]’, [its address] (data to [the date of its latest register]). Contains data from NESO’s TEC register. Supported by National Energy SO Open Data.
For our use cases:
QueueQuant, “[the page’s title]”, [its address] ([the month and year of its version]).
QueueWatch citations include the credit our data sources ask for: NESO’s on transmission pages, and the network operators’ on distribution pages, as each page shows. Pages such as Queue stats, Delays and exits and our use cases end with their own citation, ready to copy.