Huntington

United Utilities Water Plc at Capenhurst

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
United Utilities Water Plc
Site name
Huntington
Address
Pumping Station, Huntington, Chester, Wirral, CH3 6EA
Grid reference
Easting 342162, northing 363981
Licence area
Merseyside, Cheshire and North Wales (SPM)
Grid supply point
Capenhurst
Bulk supply point
CHESTER MAIN GT4 / CRANE BANK GT1 / GUILDEN SUTTON GT1 / SALTNEY G2A
Primary substation
CHESTER WATER TREATMENT WORKS T1 & T2
Connection voltage
33 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Oil, Engine (combustion / reciprocating): 11.9 MW registered
Registered capacity
11.9 MW
Maximum export capacity
11.9 MW
Maximum import capacity
0 MW
Flexible connection
Not stated
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
1300061307878
Import MPAN
1300061262998
Last updated
14 Sep 2020
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Capenhurst

GSP view

21 other sites at this grid supply point in the September 2026 edition, 1 of them at CHESTER WATER TREATMENT WORKS T1 & T2, the same primary substation. In all, the sites here total 601 MW: 217 MW connected, 384 MW accepted to connect.

  • Huntington WTWAlternative Energy Contracting Ltd, Solar, CHESTER WATER TREATMENT WORKS T1 & T2 primaryConnected4.472 MW
  • Manor RoadStorageAccepted179.625 MW
  • Capenhurst BSSAura Power BESS, StorageAccepted99 MW
  • Bridgewater PaperGas and other fossilConnected90 MW
  • Bellevue LaneRoadnight Taylor, StorageAccepted40 MW
  • BrettonCorin Hughes Ltd, StorageAccepted35 MW
  • Hooton Bio PowerNorth Lanarkshire Bio Power Limited, Gas and other fossilConnected29 MW
  • North Rd 1Baker Street Generation Limited, Gas and other fossilAccepted22.5 MW

See all 21

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose