TERMINAL PUMPING STATION
UNITED UTILITIES WATER LTD at PENWORTHAM EAST GSP / ROCHDALE SGT 1 GROUP
ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Jul 2017
- Status
- Connected
- Customer
- UNITED UTILITIES WATER LTD
- Site name
- TERMINAL PUMPING STATION
- Address
- HOWICK ROW, HOWICK ROW, PRESTON, LANCASHIRE, PR1 0NT
- Grid reference
- Easting 350363, northing 429016
- Licence area
- North West England (ENWL)
- Grid supply point
- PENWORTHAM EAST GSP / ROCHDALE SGT 1 GROUP
- Bulk supply point
- RIBBLE
- Primary substation
- HOLME RD
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- FOSSIL - OIL, ENGINE (COMBUSTION / RECIPROCATING): 2 MW registered
- Registered capacity
- 2 MW
- Maximum export capacity
- 1.9 MW
- Maximum import capacity
- 1.425 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- Not stated
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by ENWL
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1640000729436
- Import MPAN
- 1640000004960
- Last updated
- 6 Dec 2021
- Tracked since
- May 2026 edition
Change history
Tracked since the May 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at PENWORTHAM EAST GSP / ROCHDALE SGT 1 GROUP
GSP view30 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 460 MW: 317 MW connected, 143 MW accepted to connect.
- REDSCAR BUSINESS PARKCONRAD (REDSCAR) LTD, Gas and other fossil, PRESTON EAST primaryConnected42.105 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?