Distribution / SPEN / Grid supply point

Kirkby

Grid supply point in Merseyside, Cheshire and North Wales (SPM)

SPEN Embedded Capacity Register >1MW, September 2026 edition

14sites of 1 MW and over
298 MWcapacity
69 MWconnected (9 sites)
229 MWaccepted to connect (5 sites)

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Storage2163 MW–163 MW
Solar569.3 MW3.3 MW66 MW
Gas and other fossil446.3 MW46.3 MW–
Wind218 MW18 MW–
Bioenergy and waste11.3 MW1.3 MW–

Storage capacity in MWh: not published by SPEN.

Each site is grouped by its first energy source, as the register names it.

How busy is each primary substation?

Each primary substation at this grid supply point in the September 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Primary substationBulk supply pointSitesConnectedAccepted to connect
BOOTLE GT1 / LITHERLAND GT1A14.3 MW–
BOOTLE GT1 / LITHERLAND GT1A13 MW–
BOOTLE GT1 / LITHERLAND GT1A250 MW–
LITHERLAND GT2 / LITHERLAND GT1C1–30 MW
AINTREE GT1 / FORMBY GT2A / LITHERLAND GT1B13 MW–
AINTREE GT1 / FORMBY GT2A / LITHERLAND GT1B11.8 MW–
AINTREE GT1 / FORMBY GT2A / LITHERLAND GT1B11.3 MW–
AINTREE GT1 / FORMBY GT2A / LITHERLAND GT1B1–16 MW
GILLMOSS GT1 / KIRKBY GT2 / SIMONSWOOD GT11–20 MW
AINTREE GT2 / FAZAKERLEY GT1 / GILLMOSS GT214 MW–
AINTREE GT2 / FAZAKERLEY GT1 / GILLMOSS GT211.5 MW–
Not stated2–163 MW

What changed recently

Changes to the sites here found in both of two consecutive monthly editions, the latest first.

August 2026 edition to September 2026 edition: 14 sites matched. Every August site and every September site at this grid supply point had a match in the other edition.

No change to the status, capacity, technology or customer of the sites here in the editions of SPEN's register QueueWatch holds.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

How power reaches a site

A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.