PADIHAM GSP
Grid supply point in North West England (ENWL)
ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition
The register spells this grid supply point more than one way: “PADIHAM GSP” (22 sites) and “PADIHAM” (10 sites).
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Storage | 8 | 604 MW | 8 MW | 596 MW |
| Wind | 8 | 145 MW | 27 MW | 118 MW |
| Gas and other fossil | 9 | 126 MW | 29 MW | 97 MW |
| Solar | 5 | 112 MW | 5 MW | 107 MW |
| Bioenergy and waste | 2 | 5.4 MW | 5.4 MW | – |
Storage capacity in MWh: not published by ENWL.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the October 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | ||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| HUNCOAT | 3 | 11.4 MW | – | |||||||||||||||||||||||||||||||||||||||||
3 sites, 11.4 MW: 11.4 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| HUNCOAT | 1 | – | 11 MW | |||||||||||||||||||||||||||||||||||||||||
1 site, 11 MW: 11 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| HUNCOAT | 1 | – | 2.2 MW | |||||||||||||||||||||||||||||||||||||||||
1 site, 2.2 MW: 2.2 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| HUNCOAT | 7 | 38 MW | 130 MW | |||||||||||||||||||||||||||||||||||||||||
7 sites, 168 MW: 38 MW connected, 130 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| ROSSENDALE | 1 | 8 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 8 MW: 8 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| ROSSENDALE | 1 | – | 7.4 MW | |||||||||||||||||||||||||||||||||||||||||
1 site, 7.4 MW: 7.4 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| ROSSENDALE | 6 | 11 MW | 161 MW | |||||||||||||||||||||||||||||||||||||||||
6 sites, 172 MW: 11 MW connected, 161 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| NELSON | 1 | – | 7 MW | |||||||||||||||||||||||||||||||||||||||||
1 site, 7 MW: 7 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| NELSON | 2 | 5.4 MW | 35 MW | |||||||||||||||||||||||||||||||||||||||||
2 sites, 40.4 MW: 5.4 MW connected, 35 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| PADIHAM | 1 | – | 4 MW | |||||||||||||||||||||||||||||||||||||||||
1 site, 4 MW: 4 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| PADIHAM | 1 | 1 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 1 MW: 1 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| PADIHAM | 1 | 1 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 1 MW: 1 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| PADIHAM | 1 | – | 20 MW | |||||||||||||||||||||||||||||||||||||||||
1 site, 20 MW: 20 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| Not stated | 5 | – | 540 MW | |||||||||||||||||||||||||||||||||||||||||
5 sites, 540 MW: 540 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
What changed recently
Changes to sites here found in both editions of each pair, newest first.
September 2026 edition to October 2026 edition: 32 sites matched. Every September site and every October site at this grid supply point had a match in the other edition.
- WHITWORTHSeptember 2026 editionCapacity stated as 5 MW (not stated in the May 2026 edition)
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.