Distribution / ENWL / Grid supply point

PENWORTHAM WEST GSP / STANAH GSP GROUP

Grid supply point in North West England (ENWL)

ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition

ENWL's register names more than one grid supply point here, as one. QueueWatch keeps them together, as the register gives them, and does not split their sites between them.

The register spells this grid supply point more than one way: “PENWORTHAM WEST GSP / STANAH GSP GROUP” (61 sites) and “STANAH/PENWORTHAM WEST” (2 sites).

63sites of 1 MW and over
829 MWcapacity
463 MWconnected (40 sites)
366 MWaccepted to connect (23 sites)

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar17205 MW30 MW175 MW
Wind4191 MW191 MW–
Storage11189 MW25 MW164 MW
Gas and other fossil16138 MW124 MW14 MW
Other or not stated167 MW67 MW–
Bioenergy and waste1439.5 MW26 MW13.5 MW

Storage capacity in MWh: not published by ENWL.

Each site is grouped by its first energy source, as the register names it.

How busy is each primary substation?

Each primary substation at this grid supply point in the September 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Primary substationBulk supply pointSitesConnectedAccepted to connect
LYTHAM4–111 MW
PEEL35.3 MW2 MW
PEEL1–6 MW
PEEL16 MW–
PEEL11 MW–
PEEL732.7 MW40 MW
THORNTON414.1 MW–
THORNTON29 MW5 MW
THORNTON22 MW4.7 MW
THORNTON530.8 MW15 MW
BISPHAM120 MW–
BISPHAM39.3 MW7.6 MW
BISPHAM12 MW–
BISPHAM240.3 MW–
WRIGHTINGTON47.9 MW8.8 MW
WRIGHTINGTON25.4 MW–
WRIGHTINGTON12.3 MW–
WRIGHTINGTON12 MW–
WRIGHTINGTON1–20 MW
LEYLAND46.5 MW3.8 MW
LEYLAND1–6 MW
LEYLAND1–5.1 MW
LEYLAND21.4 MW2 MW
LEYLAND11 MW–
LEYLAND17.6 MW–
BLACKPOOL17 MW–
Not stated6250 MW129 MW

What changed recently

Changes to the sites here found in both of two consecutive monthly editions, the latest first.

May 2026 edition to September 2026 edition: 62 sites matched. 1 site at this grid supply point couldn't be matched between the two editions, because its details changed or it appears in only one.

No change to the status, capacity, technology or customer of the sites here in the editions of ENWL's register QueueWatch holds.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

How power reaches a site

A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.