QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

SEWAGES WORKS

UNITED UTILITIES WATER LTD at ROCHDALE SGTS 2 3 4

ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
31 May 2016
Status
Connected
Customer
UNITED UTILITIES WATER LTD
Site name
SEWAGES WORKS
Address
ROCH VALLEY WAY, ROCH VALLEY WAY, ROCHDALE, GREATER MANCHESTER, OL11 4QH
Grid reference
Easting 388199, northing 412499
Licence area
North West England (ENWL)
Grid supply point
ROCHDALE SGTS 2 3 4
Bulk supply point
ROCHDALE CENTRAL
Primary substation
ROCHDALE CENTRAL
Connection voltage
6.6 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 2.1 MW registered
Registered capacity
2.1 MW
Maximum export capacity
2.09 MW
Maximum import capacity
1.051 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
1640000539760
Import MPAN
1600000140988
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at ROCHDALE SGTS 2 3 4

GSP view

24 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 466 MW: 180 MW connected, 286 MW accepted to connect.

See all 24

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose