Distribution / Sites / Customer

VIRIDOR WASTE MANAGEMENT LIMITED

Customer named in the DNOs' registers

In UKPN's October 2026, NGED's August 2026, SSEN's September 2026, SPEN's September 2026 and ENWL's September 2026 editions

The registers spell this customer’s name more than one way: “VIRIDOR WASTE MANAGEMENT LIMITED” (14 sites), “Viridor Waste Management Limited” (11 sites), “Viridor waste management ltd” (7 sites) and “Viridor Waste Management.” (1 site).

33sites of 1 MW and over
135 MWcapacity
135 MWconnected (33 sites)
–accepted to connect (0 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNOctober 2026 edition1145.2 MW45.2 MW–
NGEDAugust 2026 edition718.9 MW18.9 MW–
SSENSeptember 2026 edition839.9 MW39.9 MW–
SPENSeptember 2026 edition12 MW2 MW–
ENWLSeptember 2026 edition629 MW29 MW–

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Bioenergy and waste28117 MW117 MW–
Other or not stated39.8 MW9.8 MW–
Storage14.5 MW4.5 MW–
Gas and other fossil13.5 MW3.5 MW–

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs' latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
ARDLEY EFW GENERATIONSSENEAST CLAYDON GSPBioenergy and wasteConnected24.7
RAIKES LANE INCINERATORENWLKEARSLEY LOCAL 33 GSPBioenergy and wasteConnected11.658
Fourth Drove Eastern Industrial EstateUKPNWalpoleBioenergy and wasteConnected8
NFPAUKPNCanterburyBioenergy and wasteConnected7
Viridor Waste Management, Beddington Farm Landfill SiteUKPNBeddington 132kVBioenergy and wasteConnected7
Hemyock broadpath landfill hemyock primary substation import/exportNGEDExeter Main SgpOther or not statedConnected5.2
Masons Landfill SiteUKPNBramfordBioenergy and wasteConnected4.96
MOSS HALL LANE GENERATORENWLKEARSLEY 132 GSPStorageConnected4.5
Ockendon B LandfillUKPNWest ThurrockBioenergy and wasteConnected4.45
Ockendon GenerationUKPNWarleyBioenergy and wasteConnected4.2

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
EAST CLAYDON GSPSSEN327.8 MW–
KEARSLEY LOCAL 33 GSPENWL317 MW–
KEARSLEY 132 GSPENWL312.1 MW–
Abham SgpNGED38.4 MW–
WalpoleUKPN18 MW–
Beddington 132kVUKPN17 MW–
CanterburyUKPN17 MW–
Exeter Main SgpNGED15.2 MW–
NinfieldUKPN25.2 MW–
BramfordUKPN15 MW–

What changed recently

Changes to its sites found in both of two consecutive monthly editions of their DNO's register, the latest first.

UKPN, September 2026 edition to October 2026 edition, for this customer's sites: 11 sites matched. Every September site and every October site had a match in the other edition.

NGED: QueueWatch holds one edition of its register so far, the August 2026 edition, so there is nothing to compare yet.

SSEN, August 2026 edition to September 2026 edition, for this customer's sites: 8 sites matched. Every August site and every September site had a match in the other edition.

SPEN, August 2026 edition to September 2026 edition, for this customer's sites: 1 site matched. Every August site and every September site had a match in the other edition.

ENWL, May 2026 edition to September 2026 edition, for this customer's sites: 6 sites matched. Every May site and every September site had a match in the other edition.

No change to the status, capacity, technology or customer of its sites in the editions QueueWatch holds.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose