Newton abbot supply c heathfield landfill import/export site
Viridor waste management ltd at Abham Sgp
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Jun 1998
- Status
- Connected
- Planning consent
- Granted 14 Jul 1997
Teignbridge · Source: REPD - Customer
- Viridor waste management ltd
- Site name
- Newton abbot supply c heathfield landfill import/export site
- Address
- Valencia Waste Heathfield 'C' Power Plant, Heathfield Landfill Site, John Acres Lane, Fosterville, Sandygate, Devon, TQ12 3GP
- Grid reference
- Easting 286107, northing 76077
- Licence area
- South West
- Grid supply point
- Abham Sgp
- Bulk supply point
- Newton Abbot Bsp (Forde Road)
- Primary substation
- Chudleigh Knighton
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biofuel - Sewage gas, Gas turbine (OCGT): 2.3 MW registered
- Registered capacity
- 2.3 MW
- Maximum export capacity
- 3.325 MW
- Maximum import capacity
- 0.143 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 2200040278866
- Import MPAN
- 2200031091895
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Abham Sgp
GSP view50 other sites at this grid supply point in the August 2026 edition, 1 of them at Chudleigh Knighton, the same primary substation. In all, the sites here total 613 MW: 178 MW connected, 435 MW accepted to connect.
- Newton abbot supply a heathfield landfill import/export siteViridor waste management ltd, Other or not stated, Chudleigh Knighton primaryConnected2.6 MW
- Alders way stor, alders way, yalberton industrial estateUk utility reserve limited, Bioenergy and wasteConnected20 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.