Generation Site Landfill Site 474789
Viridor Waste Management Limited at Ninfield
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 16 Mar 1998
- Status
- Connected
- Customer
- Viridor Waste Management Limited
- Site name
- Generation Site Landfill Site 474789
- Address
- Beddingham, East Sussex, BN8 6JX
- Grid reference
- Easting 544552, northing 107188
- Licence area
- South Eastern Power Networks (SPN)
- Grid supply point
- Ninfield
- Bulk supply point
- Lewes Grid 33kV
- Primary substation
- Lewes Central 11kV
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biofuel - Landfill Gas, Gas turbine (OCGT): 3.2 MW registered
- Registered capacity
- 3.2 MW
- Maximum export capacity
- 3.2 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1900060436923
- Import MPAN
- Not stated
- Last updated
- 15 Jan 2021
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Ninfield
GSP view32 other sites at this grid supply point in the November 2026 edition, 1 of them at Lewes Central 11kV, the same primary substation. In all, the sites here total 823 MW: 279 MW connected, 544 MW accepted to connect.
- Beddingham Landfill Site 474789Viridor Waste Management Limited, Bioenergy and waste, Lewes Central 11kV primaryConnected2 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?