MOSS HALL LANE GENERATOR
VIRIDOR WASTE MANAGEMENT LIMITED at KEARSLEY 132 GSP
ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Feb 2018
- Status
- Connected
- Customer
- VIRIDOR WASTE MANAGEMENT LIMITED
- Site name
- MOSS HALL LANE GENERATOR
- Address
- MOSS HALL ROAD, MOSS HALL ROAD, BURY, GREATER MANCHESTER, BL9 7JL
- Grid reference
- Easting 382981, northing 409872
- Licence area
- North West England (ENWL)
- Grid supply point
- KEARSLEY 132 GSP
- Bulk supply point
- BURY
- Primary substation
- HEAP BRIDGE
- Connection voltage
- 6.6 kV
- Technology group
- Storage
- Energy source 1
- STORED ENERGY (ALL STORED ENERGY IRRESPECTIVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 4.5 MW registered
- Registered capacity
- 4.5 MW
- Maximum export capacity
- 4.275 MW
- Maximum import capacity
- 1.9 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- Not stated
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by ENWL
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1640000478337
- Import MPAN
- 1640000478328
- Last updated
- 14 Mar 2024
- Tracked since
- May 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the May 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at KEARSLEY 132 GSP
GSP view26 other sites at this grid supply point in the October 2026 edition, 3 of them at HEAP BRIDGE, the same primary substation. In all, the sites here total 246 MW: 151 MW connected, 95 MW accepted to connect.
- PILSWORTH POWER PLANTVIRIDOR WASTE MANAGEMENT LIMITED, Bioenergy and waste, HEAP BRIDGE primaryConnected4.124 MW
- PILSWORTH LANDFILL SITEVIRIDOR WASTE MANAGEMENT LIMITED, Bioenergy and waste, HEAP BRIDGE primaryConnected3.45 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?