MANNINGTON GSP
Grid supply point in Southern England (SEPD)
SSEN Embedded Capacity Register, November 2026 edition
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Solar | 69 | 1.1 GW | 0.4 GW | 0.7 GW |
| Storage | 9 | 682 MW | 76 MW | 606 MW |
| Bioenergy and waste | 9 | 88.4 MW | 21.3 MW | 67.1 MW |
| Other or not stated | 5 | 61.9 MW | 45.9 MW | 16 MW |
| Wind | 1 | 4.8 MW | 4.8 MW | – |
Storage capacity in MWh: not published by SSEN.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | ||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MANNINGTON | 2 | – | 125 MW | |||||||||||||||||||||||||||||||||||||||||
2 sites, 125 MW: 125 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| MANNINGTON | 1 | 21.1 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 21.1 MW: 21.1 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| MANNINGTON | 1 | 15.2 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 15.2 MW: 15.2 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| MANNINGTON | 1 | 12.1 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 12.1 MW: 12.1 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| MANNINGTON | 1 | 10.6 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 10.6 MW: 10.6 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| MANNINGTON | 2 | 5.1 MW | 0.9 MW | |||||||||||||||||||||||||||||||||||||||||
2 sites, 6 MW: 5.1 MW connected, 0.9 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| MANNINGTON | 1 | 4.8 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 4.8 MW: 4.8 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| MANNINGTON | 1 | 4.8 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 4.8 MW: 4.8 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| MANNINGTON | 1 | 3.8 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 3.8 MW: 3.8 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| MANNINGTON | 2 | – | 300 MW | |||||||||||||||||||||||||||||||||||||||||
2 sites, 300 MW: 300 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| SHAFTESBURY | 2 | 4.3 MW | 12 MW | |||||||||||||||||||||||||||||||||||||||||
2 sites, 16.3 MW: 4.3 MW connected, 12 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| SHAFTESBURY | 2 | 4.8 MW | 10 MW | |||||||||||||||||||||||||||||||||||||||||
2 sites, 14.8 MW: 4.8 MW connected, 10 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| SHAFTESBURY | 1 | 8.9 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 8.9 MW: 8.9 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| SHAFTESBURY | 1 | 6.3 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 6.3 MW: 6.3 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| SHAFTESBURY | 1 | 4.3 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 4.3 MW: 4.3 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| SHAFTESBURY | 1 | 3.8 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 3.8 MW: 3.8 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| SHAFTESBURY | 1 | 1.4 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 1.4 MW: 1.4 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| SHAFTESBURY | 4 | – | 278 MW | |||||||||||||||||||||||||||||||||||||||||
4 sites, 278 MW: 278 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| REDHILL | 6 | 10 MW | 103 MW | |||||||||||||||||||||||||||||||||||||||||
6 sites, 113 MW: 10 MW connected, 103 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| REDHILL | 4 | 48.5 MW | 8.7 MW | |||||||||||||||||||||||||||||||||||||||||
4 sites, 57.2 MW: 48.5 MW connected, 8.7 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| REDHILL | 1 | 3.3 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 3.3 MW: 3.3 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| LYTCHETT | 2 | 13.7 MW | 12 MW | |||||||||||||||||||||||||||||||||||||||||
2 sites, 25.7 MW: 13.7 MW connected, 12 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| LYTCHETT | 1 | 16.6 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 16.6 MW: 16.6 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| LYTCHETT | 1 | 7.1 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 7.1 MW: 7.1 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| LYTCHETT | 1 | 7.1 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 7.1 MW: 7.1 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| LYTCHETT | 1 | – | 4 MW | |||||||||||||||||||||||||||||||||||||||||
1 site, 4 MW: 4 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| LYTCHETT | 1 | 3.1 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 3.1 MW: 3.1 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| LYTCHETT | 1 | 1.1 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 1.1 MW: 1.1 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| LYTCHETT | 3 | 25 MW | 76 MW | |||||||||||||||||||||||||||||||||||||||||
3 sites, 101 MW: 25 MW connected, 76 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| CHRISTCHURCH | 1 | – | 40 MW | |||||||||||||||||||||||||||||||||||||||||
1 site, 40 MW: 40 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| CHRISTCHURCH | 1 | 14.5 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 14.5 MW: 14.5 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| CHRISTCHURCH | 1 | 7.1 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 7.1 MW: 7.1 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| CHRISTCHURCH | 1 | 2.9 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 2.9 MW: 2.9 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| CHRISTCHURCH | 1 | – | 2 MW | |||||||||||||||||||||||||||||||||||||||||
1 site, 2 MW: 2 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| CHRISTCHURCH | 1 | – | 48 MW | |||||||||||||||||||||||||||||||||||||||||
1 site, 48 MW: 48 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| SALISBURY | 1 | – | 10 MW | |||||||||||||||||||||||||||||||||||||||||
1 site, 10 MW: 10 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| SALISBURY | 1 | – | 9.8 MW | |||||||||||||||||||||||||||||||||||||||||
1 site, 9.8 MW: 9.8 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| SALISBURY | 1 | 8.8 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 8.8 MW: 8.8 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| SALISBURY | 1 | – | 8.6 MW | |||||||||||||||||||||||||||||||||||||||||
1 site, 8.6 MW: 8.6 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| SALISBURY | 2 | 6.7 MW | – | |||||||||||||||||||||||||||||||||||||||||
2 sites, 6.7 MW: 6.7 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| SALISBURY | 1 | 6.2 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 6.2 MW: 6.2 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| SALISBURY | 2 | 5.3 MW | – | |||||||||||||||||||||||||||||||||||||||||
2 sites, 5.3 MW: 5.3 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| SALISBURY | 2 | 4.4 MW | 49.9 MW | |||||||||||||||||||||||||||||||||||||||||
2 sites, 54.3 MW: 4.4 MW connected, 49.9 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| MANNINGTON BSP | 2 | – | 102 MW | |||||||||||||||||||||||||||||||||||||||||
2 sites, 102 MW: 102 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| WAREHAM | 1 | 19.8 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 19.8 MW: 19.8 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| WAREHAM | 1 | 12.2 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 12.2 MW: 12.2 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| WAREHAM | 1 | 8.6 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 8.6 MW: 8.6 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| WAREHAM | 1 | 6.8 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 6.8 MW: 6.8 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| WAREHAM | 1 | 5.7 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 5.7 MW: 5.7 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| WAREHAM | 1 | 5 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 5 MW: 5 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| WAREHAM | 1 | 3.8 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 3.8 MW: 3.8 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| WAREHAM | 1 | 3.8 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 3.8 MW: 3.8 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| WAREHAM | 1 | 3.3 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 3.3 MW: 3.3 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| ARNEWOOD | 2 | 3.4 MW | – | |||||||||||||||||||||||||||||||||||||||||
2 sites, 3.4 MW: 3.4 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| ARNEWOOD | 1 | 1.4 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 1.4 MW: 1.4 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| ARNEWOOD | 1 | – | 12.5 MW | |||||||||||||||||||||||||||||||||||||||||
1 site, 12.5 MW: 12.5 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| BOURNEMOUTH | 1 | 7.1 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 7.1 MW: 7.1 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| Not stated | 7 | 23.3 MW | 48.2 MW | |||||||||||||||||||||||||||||||||||||||||
7 sites, 71.5 MW: 23.3 MW connected, 48.2 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
| Not stated | 1 | 38 MW | – | |||||||||||||||||||||||||||||||||||||||||
1 site, 38 MW: 38 MW connected
| ||||||||||||||||||||||||||||||||||||||||||||
| Not stated | 4 | 68 MW | 150 MW | |||||||||||||||||||||||||||||||||||||||||
4 sites, 218 MW: 68 MW connected, 150 MW accepted to connect
| ||||||||||||||||||||||||||||||||||||||||||||
Not found among the sites of 1 MW and over in SSEN’s November 2026 edition
2 sites last found at this grid supply point were not found among this edition’s sites of 1 MW and over by their MPAN, grid reference or name and postcode. QueueWatch keeps their pages for six months and does not say whether they have left the register.
- MILL STREET last found in the August 2026 edition
- PARK FARM last found in the July 2026 edition
What changed recently
Changes to sites here found in both editions of each pair, newest first.
October 2026 edition to November 2026 edition: 92 sites matched. 1 site at this grid supply point couldn’t be matched between the two editions, because its details changed or it appears in only one.
1 site without a match in the other edition
In the November 2026 edition only (1)
- 1400KVA + 900KW EXPORT IDNOSouthern England (SEPD)Accepted to connect0.9 MW
- 30MW PV & 30MW BESSNovember 2026 editionExport capacity changed from 31.579 MW to 60 MW
- 99.9MW BESS CHRISTCHURCH ROAD STORAGENovember 2026 editionExport capacity changed from 99.9 MW to 105.158 MW
- HAMPRESTON SOLAR FARMNovember 2026 editionExport capacity changed from 40 MW to 0.421 MW
- INVERTER CHANGENovember 2026 editionExport capacity changed from 3.64 MW to 0 MW
- INVERTER CHANGEOctober 2026 editionExport capacity changed from 0 MW to 3.64 MW
- 30MW PV & 30MW BESSSeptember 2026 editionExport capacity changed from 60 MW to 31.579 MW
- 99.9MW BESS CHRISTCHURCH ROAD STORAGESeptember 2026 editionExport capacity changed from 105.158 MW to 99.9 MW
- DRUIDS LODGE ESTATESeptember 2026 editionExport capacity changed from 0.316 MW to 61.56 MW
- HAMPRESTON SOLAR FARMSeptember 2026 editionExport capacity changed from 0.421 MW to 40 MW
- HAMPRESTON SOLAR FARMAugust 2026 editionExport capacity changed from 40 MW to 0.421 MW
- INVERTER CHANGEAugust 2026 editionExport capacity changed from 3.64 MW to 0 MW
- 30MW PV & 30MW BESSJuly 2026 editionExport capacity changed from 31.579 MW to 60 MW
- 99.9MW BESS CHRISTCHURCH ROAD STORAGEJuly 2026 editionExport capacity changed from 99.9 MW to 105.158 MW
- 30MW PV & 30MW BESSJune 2026 editionExport capacity changed from 60 MW to 31.579 MW
- 99.9MW BESS CHRISTCHURCH ROAD STORAGEJune 2026 editionExport capacity changed from 105.158 MW to 99.9 MW
- DRUIDS LODGE ESTATEJune 2026 editionExport capacity changed from 61.56 MW to 0.316 MW
- INVERTER CHANGEJune 2026 editionExport capacity changed from 0 MW to 3.64 MW
- 30MW PV & 30MW BESSMay 2026 editionExport capacity changed from 31.579 MW to 60 MW
- HAMPRESTON SOLAR FARMMay 2026 editionExport capacity changed from 0.421 MW to 40 MW
- INVERTER CHANGEMay 2026 editionExport capacity changed from 3.64 MW to 0 MW
- 30MW PV & 30MW BESSApril 2026 editionExport capacity changed from 60 MW to 31.579 MW
- 99.9MW BESS CHRISTCHURCH ROAD STORAGEApril 2026 editionExport capacity changed from 99.9 MW to 105.158 MW
- HAMPRESTON SOLAR FARMApril 2026 editionExport capacity changed from 40 MW to 0.421 MW
- 30MW PV & 30MW BESSFebruary 2026 editionExport capacity changed from 30 MW to 60 MW
- DRUIDS LODGE ESTATEFebruary 2026 editionExport capacity changed from 60 MW to 61.56 MW
- INVERTER CHANGEFebruary 2026 editionExport capacity changed from 0 MW to 3.64 MW
- MILL STREETFebruary 2026 editionExport capacity changed from 13.2 MW to 0.211 MW
- CANFORD EFWJuly 2025 editionTechnology stated as Bioenergy and waste (not stated in the June 2025 edition)
- BIFFA WASTE SERVICES LIMITEDApril 2025 editionTechnology stated as Bioenergy and waste (not stated in the March 2025 edition)
- DROVE LANE SOLARApril 2025 editionTechnology stated as Solar (not stated in the March 2025 edition)
- Site not namedApril 2025 editionTechnology stated as Solar (not stated in the March 2025 edition)
- HALE SOLARNovember 2023 editionCapacity changed from 5.242 MW to 4.731 MW
- HENBURY PVNovember 2023 editionCustomer changed from LIGHTSOURCE SPV 50 LIMITED to LIGHTSOURCE SPV 5DATA NOT AVAILABLE LIMITED
- PV GENERATIONNovember 2023 editionCapacity changed from 13.474 MW to 12.16 MW
- PV GENERATIONNovember 2023 editionCapacity changed from 7.579 MW to 6.84 MW
- PV GENERATIONNovember 2023 editionCapacity changed from 11.789 MW to 10.64 MW
- REDBRIDGE FARMNovember 2023 editionCapacity changed from 5.263 MW to 3.344 MW
- SOLAR FARMNovember 2023 editionCustomer changed from TUSC LTD to COOP PPA SITES
- SOUTH SOLAR FARMNovember 2023 editionCapacity changed from 40 MW to 38 MW
- WOODTOWN SOLAR LIMITEDNovember 2023 editionCapacity changed from 4.011 MW to 3.62 MW
- AVON TYRRELL SOLAR FARMSeptember 2023 editionTechnology changed from Solar to Bioenergy and waste
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.