QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

WHITEHEAD LANDFILL SITE

VIRIDOR WASTE MANAGEMENT LIMITED at KEARSLEY LOCAL 33 GSP

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Jun 2006
Status
Connected
Planning consent
Granted 1 May 2002
Wigan, reference A/02/55506 · Source: REPD
Customer
VIRIDOR WASTE MANAGEMENT LIMITED
Site name
WHITEHEAD LANDFILL SITE
Address
EAST LANCASHIRE ROAD, ASTLEY, TYLDESLEY, MANCHESTER, GREATER MANCHESTER, M29 7HX
Grid reference
Easting 371505, northing 400885
Licence area
North West England (ENWL)
Grid supply point
KEARSLEY LOCAL 33 GSP
Bulk supply point
Not stated
Primary substation
HILL TOP T11 & T12
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
BIOFUEL - LANDFILL GAS, ENGINE (COMBUSTION / RECIPROCATING): 3.3 MW registered
Registered capacity
3.3 MW
Maximum export capacity
3.135 MW
Maximum import capacity
0.238 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
1630000351875
Import MPAN
1630000351271
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at KEARSLEY LOCAL 33 GSP

GSP view

13 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 84.4 MW: 74.5 MW connected, 9.9 MW accepted to connect.

  • RAKE LN GENERATIONGas and other fossilConnected21.1 MW
  • SALFORD 2 STORSTOR 129 LTD, Gas and other fossilConnected20 MW
  • RAIKES LANE INCINERATORVIRIDOR WASTE MANAGEMENT LIMITED, Bioenergy and waste, BOLTON WASTE primaryConnected11.658 MW
  • SHORESIDE STABLES 1SMITH BROTHERS CONTRACTORS, Storage, RINGLEY primaryAccepted7 MW
  • ALDI STORES LTDBUILDING MANAGEMENT TECHNOLOGY, Solar, CUTACRE primaryConnected4.3 MW
  • BENT SPUR FARMCS BENT SPUR SOLAR FARM LTD, Solar, RINGLEY primaryConnected4.08 MW
  • AMAZON MAN3AMAZON UK SERVICES LTD, Solar, CUTACRE primaryAccepted2.86 MW
  • 4 NEW BAILEYENGLISH CITIES FUND, Gas and other fossil, CHAPEL WHARF primaryConnected2.4 MW

See all 13

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.