Distribution / Sites / Customer

AMP ENERGY SERVICES LTD

Customer named in the DNOs’ registers

In UKPN’s November 2026, SSEN’s November 2026, SPEN’s September 2026 and ENWL’s October 2026 editions

The registers spell this customer’s name more than one way: “AMP ENERGY SERVICES LTD” (9 sites), “AMP Energy Services” (8 sites), “AMP Energy Services Limited” (3 sites), “AMP ENERGY SERVICES LIMITED” (2 sites) and “AMP Energy Services Ltd” (1 site).

23sites of 1 MW and over
98 MWcapacity
54.7 MWconnected (14 sites)
43.3 MWaccepted to connect (9 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNNovember 2026 edition932.7 MW32.7 MW–
SSENNovember 2026 edition28.1 MW–8.1 MW
SPENSeptember 2026 edition311.9 MW11.9 MW–
ENWLOctober 2026 edition945.4 MW10.1 MW35.3 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Gas and other fossil1872.7 MW54.7 MW18 MW
Storage317.2 MW–17.2 MW
Bioenergy and waste28.1 MW–8.1 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs’ latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
POULTON POWERENWLPENWORTHAM WEST GSP / STANAH GSP GROUPStorageAccepted to connect7.587
LAND AND BUILDINGS NORTH EAST OF BRYN ROADENWLSPEN - OUT OF AREAGas and other fossilAccepted to connect7
Edison RoadUKPNSundonGas and other fossilConnected5.07
WHITBROOK POWERENWLWHITEGATE GSPGas and other fossilConnected5.07
GLOWHOUSE POWERENWLPENWORTHAM WEST GSP / STANAH GSP GROUPStorageAccepted to connect5.058
Gallions PowerUKPNBarking West 33kV (LPN)Gas and other fossilConnected5
ISABELLA POWERENWLBREDBURY GSPGas and other fossilConnected5
TAME POWERENWLSTALYBRIDGE GSPStorageAccepted to connect4.6
SCHOLES POWERENWLWHITEGATE GSPGas and other fossilAccepted to connect4.561
Crosby PowerSPENKirkbyGas and other fossilConnected4.3

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
PENWORTHAM WEST GSP / STANAH GSP GROUPENWL2–12.6 MW
STALYBRIDGE GSPENWL3–11.1 MW
WHITEGATE GSPENWL25.1 MW4.5 MW
SundonUKPN29.1 MW–
MELKSHAM GSPSSEN2–8.1 MW
WymondleyUKPN28.1 MW–
SPEN - OUT OF AREAENWL1–7 MW
ElstreeUKPN26 MW–
Barking West 33kV (LPN)UKPN15 MW–
BREDBURY GSPENWL15 MW–

What changed recently

Changes to its sites found in both editions of each pair, newest first.

UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 9 sites matched. Every October site and every November site had a match in the other edition.

SSEN, October 2026 edition to November 2026 edition, for this customer’s sites: 2 sites matched. Every October site and every November site had a match in the other edition.

SPEN, August 2026 edition to September 2026 edition, for this customer’s sites: 3 sites matched. Every August site and every September site had a match in the other edition.

ENWL, September 2026 edition to October 2026 edition, for this customer’s sites: 9 sites matched. Every September site and every October site had a match in the other edition.

No change to any detail QueueWatch tracks for its sites so far.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?