QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

CENTRIC POWER

AMP ENERGY SERVICES LTD at MELKSHAM GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
AMP ENERGY SERVICES LTD
Site name
CENTRIC POWER
Address
CENTRIC POWER, ANDOVER BUSINESS PARK, ANDOVER, HAMPSHIRE, SP11 8BF
Grid reference
Easting 433660, northing 145751
Licence area
Southern England (SEPD)
Grid supply point
MELKSHAM GSP
Bulk supply point
ANDOVER
Primary substation
PORTWAY
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
ADVANCED FUEL (PRODUCED VIA GASIFICATION OR PYROLYSIS OF BIOFUEL OR WASTE), GAS TURBINE (OCGT): 4.052 MW registered
Registered capacity
4.052 MW
Change to maximum export capacity
4.052 MW
Change to maximum import capacity
0.211 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
27 Jan 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at MELKSHAM GSP

GSP view

95 other sites at this grid supply point in the November 2026 edition, 4 of them at PORTWAY, the same primary substation. In all, the sites here total 1.9 GW: 0.5 GW connected, 1.4 GW accepted to connect.

See all 95

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?