QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

SCHOLES POWER

AMP ENERGY SERVICES LTD at WHITEGATE GSP

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
AMP ENERGY SERVICES LTD
Site name
SCHOLES POWER
Address
TWEEDALE WAY, OLDHAM, OLDHAM, GREATER MANCHESTER, OL9 8EH
Grid reference
Easting 389872, northing 402362
Licence area
North West England (ENWL)
Grid supply point
WHITEGATE GSP
Bulk supply point
CHADDERTON
Primary substation
HOLLINWOOD
Connection voltage
6.6 kV
Technology group
Gas and other fossil
Energy source 1
FOSSIL - GAS, ENGINE (COMBUSTION / RECIPROCATING): 4.561 MW registered
Registered capacity
4.561 MW
Maximum export capacity
0 MW
Maximum import capacity
0 MW
Change to maximum export capacity
4.84 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
29 Jan 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Mar 2024
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at WHITEGATE GSP

GSP view

23 other sites at this grid supply point in the October 2026 edition, 1 of them at HOLLINWOOD, the same primary substation. In all, the sites here total 359 MW: 79 MW connected, 280 MW accepted to connect.

See all 23

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?