Handley Page B

AMP Energy Services at Elstree

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
28 Sep 2020
Status
Connected
Customer
AMP Energy Services
Site name
Handley Page B
Address
Old Parkbury Lane, St Albans, Hertfordshire, AL2 2DZ
Grid reference
Easting 515648, northing 202465
Licence area
Eastern Power Networks (EPN)
Grid supply point
Elstree
Bulk supply point
Hatfield Grid 33kV
Primary substation
Shenley Primary 11kV
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Gas turbine (OCGT): 4 MW registered
Registered capacity
4 MW
Maximum export capacity
4 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not stated
Export MPAN
1050002001349
Import MPAN
1050002001330
Last updated
13 Nov 2020
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Elstree

GSP view

18 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 223 MW: 157 MW connected, 66 MW accepted to connect.

  • Lye Green Solar FarmExagen Development Limited, SolarAccepted50 MW
  • Tollgate FarmBrockwell Storage & Solar Limited, StorageConnected49.5 MW
  • Spring WayEnergetics Electricity, Gas and other fossilConnected30 MW
  • Eastman WayUK PowerReserve Limited, Gas and other fossilConnected20 MW
  • Tollgate FarmBrockwell Storage & Solar Limited, SolarAccepted16 MW
  • Gyron Maylands DatacentreGyron Internet Limited, Gas and other fossil, Industrial Primary 11kV primaryConnected8 MW
  • Mirror Colour Print LtdTrinity Mirror, Gas and other fossil, Bushey Mill Grid 11kV primaryConnected7.2 MW
  • Booker Cash & CarrySterling Power Utilities, Gas and other fossil, Tunnel Primary 11kV primaryConnected5.5 MW

See all 18

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?