Tilbury
Grid supply point in Eastern Power Networks (EPN)
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Bioenergy and waste | 6 | 137 MW | 89 MW | 48 MW |
| Storage | 4 | 127 MW | 37 MW | 90 MW |
| Gas and other fossil | 7 | 109 MW | 49 MW | 60 MW |
| Solar | 6 | 82.1 MW | 32.2 MW | 49.9 MW |
| Wind | 1 | 9.2 MW | 9.2 MW | – |
Storage capacity in MWh: no site here states any.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | |||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Basildon Grid 33kV | 2 | 9.5 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
2 sites, 9.5 MW: 9.5 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| Basildon Grid 33kV | 5 | 77.7 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
5 sites, 77.7 MW: 77.7 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| South Benfleet Grid 33kV | 1 | 14 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 14 MW: 14 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| South Benfleet Grid 33kV | 1 | 2 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 2 MW: 2 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| South Benfleet Grid 33kV | 1 | 21 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 21 MW: 21 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| Tilbury Compact Grid 33kV | 1 | 3 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 3 MW: 3 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| Tilbury Compact Grid 33kV | 1 | 2.5 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 2.5 MW: 2.5 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| Tilbury Compact Grid 33kV | 2 | 18.2 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
2 sites, 18.2 MW: 18.2 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| Coryton Grid 33kV | 1 | – | 20 MW | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 20 MW: 20 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| Tilbury | 1 | 7.9 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 7.9 MW: 7.9 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| Not stated | 8 | 60 MW | 228 MW | ||||||||||||||||||||||||||||||||||||||||||||||
8 sites, 288 MW: 60 MW connected, 228 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
What changed recently
Changes to sites here found in both editions of each pair, newest first.
October 2026 edition to November 2026 edition: 24 sites matched. Every October site and every November site at this grid supply point had a match in the other edition.
- (ANM) East Tilbury QuarryNovember 2026 editionTarget energisation date moved from 30 Oct 2030 to 11 Jan 2032 (14 months later)
- (ANM) SS17 9LL The ManorwayNovember 2026 editionTarget energisation date moved from 30 Nov 2024 to 30 Nov 2025 (12 months later)
- Lower Dunton RoadNovember 2026 editionTarget energisation date not stated (30 Oct 2024 in the October 2026 edition)
- Wharf RoadNovember 2026 editionTarget energisation date moved from 13 Mar 2025 to 30 Mar 2026 (13 months later)
- Lower Dunton RoadOctober 2026 editionCustomer changed from Conrad Energy Limited to Conrad (Lower Dunton) Limited
- Tilbury Docks Ph2October 2026 editionCapacity changed from 20 MW to 40 MW
- Tilbury Docks Ph2October 2026 editionCustomer changed from ESB International to Thameside Energy Recovery Facility Limited 2021
- Tilbury Docks Ph2October 2026 editionExport capacity changed from 20 MW to 40 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.