COWLEY GSP
Grid supply point in Southern England (SEPD)
SSEN Embedded Capacity Register, November 2026 edition
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Solar | 52 | 1.2 GW | 0.2 GW | 1.0 GW |
| Storage | 6 | 435 MW | – | 435 MW |
| Other or not stated | 7 | 325 MW | 113 MW | 212 MW |
| Bioenergy and waste | 6 | 35 MW | 27.4 MW | 7.6 MW |
| Gas and other fossil | 1 | 11.3 MW | – | 11.3 MW |
Storage capacity in MWh: not published by SSEN.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | |||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| WITNEY | 2 | – | 97.4 MW | ||||||||||||||||||||||||||||||||||||||||||||||
2 sites, 97.4 MW: 97.4 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| WITNEY | 2 | 33.3 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
2 sites, 33.3 MW: 33.3 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| WITNEY | 1 | 9.5 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 9.5 MW: 9.5 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| WITNEY | 1 | 9.4 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 9.4 MW: 9.4 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| WITNEY | 1 | – | 5 MW | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 5 MW: 5 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| WITNEY | 1 | 1.9 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 1.9 MW: 1.9 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| WITNEY | 5 | – | 393 MW | ||||||||||||||||||||||||||||||||||||||||||||||
5 sites, 393 MW: 393 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| COWLEY LOCAL | 3 | 6.1 MW | 13.7 MW | ||||||||||||||||||||||||||||||||||||||||||||||
3 sites, 19.8 MW: 6.1 MW connected, 13.7 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| COWLEY LOCAL | 3 | 15 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
3 sites, 15 MW: 15 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| COWLEY LOCAL | 2 | – | 7.3 MW | ||||||||||||||||||||||||||||||||||||||||||||||
2 sites, 7.3 MW: 7.3 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| COWLEY LOCAL | 1 | – | 2.9 MW | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 2.9 MW: 2.9 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| COWLEY LOCAL | 5 | – | 392 MW | ||||||||||||||||||||||||||||||||||||||||||||||
5 sites, 392 MW: 392 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| DRAYTON | 1 | 33.3 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 33.3 MW: 33.3 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| DRAYTON | 2 | 14.3 MW | 12.5 MW | ||||||||||||||||||||||||||||||||||||||||||||||
2 sites, 26.8 MW: 14.3 MW connected, 12.5 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| DRAYTON | 1 | 20.2 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 20.2 MW: 20.2 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| DRAYTON | 1 | 13.4 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 13.4 MW: 13.4 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| DRAYTON | 1 | 11.2 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 11.2 MW: 11.2 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| DRAYTON | 1 | 9.5 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 9.5 MW: 9.5 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| DRAYTON | 1 | – | 7.6 MW | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 7.6 MW: 7.6 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| DRAYTON | 1 | 1.6 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 1.6 MW: 1.6 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| DRAYTON | 3 | – | 124 MW | ||||||||||||||||||||||||||||||||||||||||||||||
3 sites, 124 MW: 124 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| YARNTON | 2 | 9.5 MW | 10 MW | ||||||||||||||||||||||||||||||||||||||||||||||
2 sites, 19.5 MW: 9.5 MW connected, 10 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| YARNTON | 1 | – | 13.2 MW | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 13.2 MW: 13.2 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| YARNTON | 1 | 4.8 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 4.8 MW: 4.8 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| YARNTON | 1 | 4.5 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 4.5 MW: 4.5 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| YARNTON | 1 | 4.1 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 4.1 MW: 4.1 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| YARNTON | 1 | 1.9 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 1.9 MW: 1.9 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| YARNTON | 1 | – | 1 MW | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 1 MW: 1 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| YARNTON | 6 | 22 MW | 105 MW | ||||||||||||||||||||||||||||||||||||||||||||||
6 sites, 127 MW: 22 MW connected, 105 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| OXFORD | 2 | – | 99.9 MW | ||||||||||||||||||||||||||||||||||||||||||||||
2 sites, 99.9 MW: 99.9 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| OXFORD | 1 | – | 20 MW | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 20 MW: 20 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| HEADINGTON | 1 | 12.4 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 12.4 MW: 12.4 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| HEADINGTON | 1 | 9.5 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 9.5 MW: 9.5 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| HEADINGTON | 1 | 7.1 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 7.1 MW: 7.1 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| HEADINGTON | 1 | 6.8 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 6.8 MW: 6.8 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| HEADINGTON | 3 | – | 4.7 MW | ||||||||||||||||||||||||||||||||||||||||||||||
3 sites, 4.7 MW: 4.7 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
| HIGH WYCOMBE | 1 | 16.2 MW | – | ||||||||||||||||||||||||||||||||||||||||||||||
1 site, 16.2 MW: 16.2 MW connected
| |||||||||||||||||||||||||||||||||||||||||||||||||
| Not stated | 8 | 95 MW | 325 MW | ||||||||||||||||||||||||||||||||||||||||||||||
8 sites, 420 MW: 95 MW connected, 325 MW accepted to connect
| |||||||||||||||||||||||||||||||||||||||||||||||||
Not found among the sites of 1 MW and over in SSEN’s November 2026 edition
1 site last found at this grid supply point was not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode. QueueWatch keeps its page for six months and does not say whether it has left the register.
- COLLEGE FARM last found in the August 2026 edition
Listed at under 1 MW in SSEN’s November 2026 edition
1 site last listed here at 1 MW or over is listed in this edition at under 1 MW. QueueWatch keeps its page for six months.
- 1120KVA IMPORT, 610KW PV last found in the October 2026 edition
What changed recently
Changes to sites here found in both editions of each pair, newest first.
October 2026 edition to November 2026 edition: 70 sites matched. 3 sites at this grid supply point couldn’t be matched between the two editions, because their details changed or they appear in only one.
3 sites without a match in the other edition
In the November 2026 edition only (2)
- 2MVA IMPORT 1.9MW PV (949KW EXP)Southern England (SEPD)Accepted to connect1.9 MW
- TRITAX SYMMETRY PARKSouthern England (SEPD)Accepted to connect0.949 MW
In the October 2026 edition only (1)
- 1120KVA IMPORT, 610KW PVSouthern England (SEPD)Accepted to connectListed at under 1 MW in the November 2026 edition0.61 MW
- EYNSHAM ESTATE - PV & BESSNovember 2026 editionExport capacity changed from 52.526 MW to 100 MW
- Site not namedNovember 2026 editionExport capacity changed from 85.5 MW to 73.684 MW
- UNIPART GROUP OF COMPANIESNovember 2026 editionExport capacity changed from 0 MW to 4.949 MW
- UNIPART GROUP OF COMPANIESNovember 2026 editionExport capacity changed from 1.9 MW to 2.4 MW
- Site not namedOctober 2026 editionExport capacity changed from 1.4 MW to 1.9 MW
- SPRING FARMOctober 2026 editionExport capacity changed from 0.105 MW to 13.2 MW
- UNIPART GROUP OF COMPANIESOctober 2026 editionExport capacity changed from 4.949 MW to 0 MW
- UNIPART GROUP OF COMPANIESOctober 2026 editionExport capacity changed from 2.4 MW to 1.9 MW
- WELLBECK HEALTH CENTREOctober 2026 editionExport capacity changed from 0.7 MW to 1 MW
- Site not namedSeptember 2026 editionExport capacity changed from 73.684 MW to 85.5 MW
- Site not namedSeptember 2026 editionExport capacity changed from 1.9 MW to 1.4 MW
- UNIPART GROUP OF COMPANIESSeptember 2026 editionExport capacity changed from 1.9 MW to 2.4 MW
- WELLBECK HEALTH CENTRESeptember 2026 editionExport capacity changed from 1 MW to 0.7 MW
- Site not namedAugust 2026 editionExport capacity changed from 1.4 MW to 1.9 MW
- SPRING FARMAugust 2026 editionExport capacity changed from 13.2 MW to 0.105 MW
- UNIPART GROUP OF COMPANIESAugust 2026 editionExport capacity changed from 0 MW to 4.949 MW
- UNIPART GROUP OF COMPANIESAugust 2026 editionExport capacity changed from 2.4 MW to 1.9 MW
- Site not namedJuly 2026 editionExport capacity changed from 30 MW to 0.105 MW
- WELLBECK HEALTH CENTREJuly 2026 editionExport capacity changed from 0.7 MW to 1 MW
- Site not namedJune 2026 editionExport capacity changed from 85.5 MW to 73.684 MW
- SPRING FARMJune 2026 editionExport capacity changed from 0.105 MW to 13.2 MW
- UNIPART GROUP OF COMPANIESJune 2026 editionExport capacity changed from 4.949 MW to 0 MW
- UNIPART GROUP OF COMPANIESJune 2026 editionExport capacity changed from 1.9 MW to 2.4 MW
- WELLBECK HEALTH CENTREJune 2026 editionExport capacity changed from 1 MW to 0.7 MW
- EYNSHAM ESTATE - PV & BESSMay 2026 editionExport capacity changed from 100 MW to 52.526 MW
- UNIPART GROUP OF COMPANIESMay 2026 editionExport capacity changed from 0 MW to 4.949 MW
- UNIPART GROUP OF COMPANIESMay 2026 editionExport capacity changed from 2.4 MW to 1.9 MW
- WELLBECK HEALTH CENTREMay 2026 editionExport capacity changed from 0.7 MW to 1 MW
- EYNSHAM ESTATE - PV & BESSApril 2026 editionExport capacity changed from 52.526 MW to 100 MW
- Site not namedApril 2026 editionExport capacity changed from 9.3 MW to 11.25 MW
- Site not namedApril 2026 editionExport capacity changed from 73.684 MW to 85.5 MW
- Site not namedApril 2026 editionExport capacity changed from 1.9 MW to 1.4 MW
- UNIPART GROUP OF COMPANIESApril 2026 editionExport capacity changed from 4.949 MW to 0 MW
- UNIPART GROUP OF COMPANIESApril 2026 editionExport capacity changed from 1.9 MW to 2.4 MW
- WELLBECK HEALTH CENTREApril 2026 editionExport capacity changed from 1 MW to 0.7 MW
- EYNSHAM ESTATE - PV & BESSFebruary 2026 editionExport capacity changed from 49.9 MW to 52.526 MW
- Site not namedFebruary 2026 editionExport capacity changed from 70 MW to 73.684 MW
- Site not namedFebruary 2026 editionExport capacity changed from 0.949 MW to 1.9 MW
- SPRING FARMFebruary 2026 editionExport capacity changed from 12 MW to 0.105 MW
- UNIPART GROUP OF COMPANIESFebruary 2026 editionExport capacity changed from 0 MW to 4.949 MW
- UNIPART GROUP OF COMPANIESFebruary 2026 editionExport capacity changed from 0 MW to 1.9 MW
- WELLBECK HEALTH CENTREFebruary 2026 editionExport capacity changed from 0.999 MW to 1 MW
- AGRIVERT LIMITEDJuly 2025 editionTechnology stated as Bioenergy and waste (not stated in the June 2025 edition)
- SEVERN TRENT GREEN POWER LIMITEDJuly 2025 editionTechnology stated as Bioenergy and waste (not stated in the June 2025 edition)
- CALCUTT SOLAR PVApril 2025 editionTechnology stated as Solar (not stated in the March 2025 edition)
- WHEATLEY GAS GENERATIONDecember 2023 editionCustomer changed from SAVILLS (UK) LTD to WHEATLEY POWER EXPORT
- WHEATLEY GAS GENERATIONDecember 2023 editionExport capacity changed from 7.12 MW to 6.764 MW
- WHEATLEY GAS GENERATIONDecember 2023 editionStatus changed from “accepted to connect” to “connected”
- BROOK FARM PVNovember 2023 editionCapacity changed from 8.421 MW to 6.84 MW
- CALCUTT SOLAR PVNovember 2023 editionCapacity stated as 12.35 MW (not stated in the October 2023 edition)
- CALCUTT SOLAR PVNovember 2023 editionFlexible connection stated as “no” (not stated in the October 2023 edition)
- CALCUTT SOLAR PVNovember 2023 editionTechnology not stated (Solar in the October 2023 edition)
- FLIT FARM PVNovember 2023 editionCapacity changed from 21.053 MW to 9.5 MW
- FLIT FARM PVNovember 2023 editionCustomer changed from FLIT SOLAR PARK LIMITED to GREENCOAT SOLAR ASSETS II LIMITED
- ROWLES FARM PVNovember 2023 editionCapacity changed from 10.526 MW to 9.5 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.