UNIPART GROUP OF COMPANIES
At COWLEY GSP
SSEN Embedded Capacity Register, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Dec 2030
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- UNIPART GROUP OF COMPANIES
- Address
- PLOTS 2A & 2B UNIPART HOUSE, GARSINGTON ROAD, OXFORD, OXFORDSHIRE, OX4 2PG
- Grid reference
- Easting 456392, northing 203755
- Licence area
- Southern England (SEPD)
- Grid supply point
- COWLEY GSP
- Bulk supply point
- COWLEY LOCAL
- Primary substation
- COWLEY LOCAL
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 2.4 MW registered
- Registered capacity
- 2.4 MW
- Change to maximum export capacity
- 1.9 MW
- Change to maximum import capacity
- 1.9 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 4 Sep 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- September 2025 edition
Change history
Tracked since the September 2025 edition, across 14 editions.
Changes to the details QueueWatch tracks, newest first.
- October 2026 editionExport capacity changed from 2.4 MW to 1.9 MW
- September 2026 editionExport capacity changed from 1.9 MW to 2.4 MW
- August 2026 editionExport capacity changed from 2.4 MW to 1.9 MW
- June 2026 editionExport capacity changed from 1.9 MW to 2.4 MW
- May 2026 editionExport capacity changed from 2.4 MW to 1.9 MW
- April 2026 editionExport capacity changed from 1.9 MW to 2.4 MW
- February 2026 editionExport capacity changed from 0 MW to 1.9 MW
- November 2025 editionTarget energisation date stated as 31 Dec 2030 (not stated in the October 2025 edition)
Also at COWLEY GSP
GSP view70 other sites at this grid supply point in the October 2026 edition, 1 of them at COWLEY LOCAL, the same primary substation. In all, the sites here total 2 GW: 0.4 GW connected, 1.6 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose