QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

WHEATLEY GAS GENERATION

WHEATLEY POWER EXPORT at COWLEY GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
27 Sep 2023
Status
Connected
Customer
WHEATLEY POWER EXPORT
Site name
WHEATLEY GAS GENERATION
Address
OXFORD, OXFORDSHIRE, OX33 1YW
Grid reference
Easting 460415, northing 205682
Licence area
Southern England (SEPD)
Grid supply point
COWLEY GSP
Bulk supply point
HEADINGTON
Primary substation
WHEATLEY
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
BIOFUEL - LANDFILL GAS: 7.12 MW registered
Registered capacity
7.12 MW
Maximum export capacity
6.764 MW
Maximum import capacity
0.21 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000060295529
Import MPAN
2000060330625
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

  • December 2023 edition
    Status changed from “accepted to connect” to “connected”
  • December 2023 edition
    Customer changed from SAVILLS (UK) LTD to WHEATLEY POWER EXPORT
  • December 2023 edition
    Export capacity changed from 7.12 MW to 6.764 MW

Also at COWLEY GSP

GSP view

71 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 2.0 GW: 0.4 GW connected, 1.6 GW accepted to connect.

See all 71

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?