QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Site not named

At COWLEY GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Dec 2037
Status
Accepted to connect
Customer
Not stated
Site name
Not stated
Address
DIAMOND FARM, ISLIP ROAD BLETCHINGDON, KIDLINGTON, OXFORDSHIRE, OX5 3DR
Grid reference
Easting 451381, northing 216943
Licence area
Southern England (SEPD)
Grid supply point
COWLEY GSP
Bulk supply point
YARNTON
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 30 MW registered
Registered capacity
30 MW
Change to maximum export capacity
0.105 MW
Change to maximum import capacity
0.105 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
10 Jun 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
July 2025 edition

Change history

Tracked since the July 2025 edition, across 17 editions.

Changes to the details QueueWatch tracks, newest first.

  • July 2026 edition
    Export capacity changed from 30 MW to 0.105 MW
  • November 2025 edition
    Target energisation date stated as 31 Dec 2037 (not stated in the October 2025 edition)

Also at COWLEY GSP

GSP view

71 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 2.0 GW: 0.4 GW connected, 1.6 GW accepted to connect.

See all 71

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?