HASELEY SOLAR FARM - SOLAR PV
LOW CARBON UK SOLAR INVESTMENT COMPANY LIMITED at COWLEY GSP
SSEN Embedded Capacity Register, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 4 Nov 2025
- Status
- Accepted to connect
- Customer
- LOW CARBON UK SOLAR INVESTMENT COMPANY LIMITED
- Site name
- HASELEY SOLAR FARM - SOLAR PV
- Address
- PEGGS FARM, GREAT HASELEY, OXFORD, OXFORDSHIRE, OX44 7LF
- Grid reference
- Easting 464994, northing 201159
- Licence area
- Southern England (SEPD)
- Grid supply point
- COWLEY GSP
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 50 MW registered
- Registered capacity
- 50 MW
- Change to maximum export capacity
- 50 MW
- Change to maximum import capacity
- 0.05 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 15 Mar 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- April 2024 edition
Change history
Tracked since the April 2024 edition, across 31 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2025 editionTarget energisation date stated as 4 Nov 2025 (not stated in the October 2025 edition)
Also at COWLEY GSP
GSP view70 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 2 GW: 0.4 GW connected, 1.6 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose