QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

WELLBECK HEALTH CENTRE

At COWLEY GSP

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
19 Dec 2026
Status
Accepted to connect
Customer
Not stated
Site name
WELLBECK HEALTH CENTRE
Address
WELLBECK HEALTH CENTRE, HALLEY COURT, OXFORD, OXFORDSHIRE, OX2 8EJ
Grid reference
Easting 450218, northing 210762
Licence area
Southern England (SEPD)
Grid supply point
COWLEY GSP
Bulk supply point
YARNTON
Primary substation
LOVELACE ROAD
Connection voltage
11 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 1 MW registered
Registered capacity
1 MW
Change to maximum export capacity
0.7 MW
Change to maximum import capacity
0.7 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
19 Dec 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
January 2026 edition

Change history

Tracked since the January 2026 edition, across 9 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at COWLEY GSP

GSP view

70 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 2 GW: 0.4 GW connected, 1.6 GW accepted to connect.

See all 70

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose