UNIPART GROUP OF COMPANIES

At COWLEY GSP

SSEN Embedded Capacity Register, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
1 Jul 2031
Status
Accepted to connect
Customer
Not stated
Site name
UNIPART GROUP OF COMPANIES
Address
PLOTS 1 & 3 UNIPART HOUSE, GARSINGTON ROAD, OXFORD, OXFORDSHIRE, OX4 2PG
Grid reference
Easting 456392, northing 203755
Licence area
Southern England (SEPD)
Grid supply point
COWLEY GSP
Bulk supply point
COWLEY LOCAL
Primary substation
COWLEY LOCAL
Connection voltage
11 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 4.949 MW registered
Registered capacity
4.949 MW
Change to maximum export capacity
0 MW
Change to maximum import capacity
0 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
12 Sep 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
October 2025 edition

Change history

Tracked since the October 2025 edition, across 13 editions.

Changes to the details QueueWatch tracks, newest first.

  • October 2026 edition
    Export capacity changed from 4.949 MW to 0 MW
  • August 2026 edition
    Export capacity changed from 0 MW to 4.949 MW
  • June 2026 edition
    Export capacity changed from 4.949 MW to 0 MW
  • May 2026 edition
    Export capacity changed from 0 MW to 4.949 MW
  • April 2026 edition
    Export capacity changed from 4.949 MW to 0 MW
  • February 2026 edition
    Export capacity changed from 0 MW to 4.949 MW
  • November 2025 edition
    Target energisation date stated as 1 Jul 2031 (not stated in the October 2025 edition)

Also at COWLEY GSP

GSP view

70 other sites at this grid supply point in the October 2026 edition, 1 of them at COWLEY LOCAL, the same primary substation. In all, the sites here total 2 GW: 0.4 GW connected, 1.6 GW accepted to connect.

See all 70

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose