QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

COLLEGE FARM

At COWLEY GSP

SSEN Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
19 Jan 2027
Status
Accepted to connect
Customer
Not stated
Site name
COLLEGE FARM
Address
COLLEGE FARM, BANBURY, OXFORDSHIRE, OX15 0SU
Grid reference
Easting 446943, northing 231185
Licence area
Southern England (SEPD)
Grid supply point
COWLEY GSP
Bulk supply point
YARNTON
Primary substation
DEDDINGTON
Connection voltage
11 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 4.9 MW registered
Registered capacity
4.9 MW
Change to maximum export capacity
4.9 MW
Change to maximum import capacity
0.49 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
19 Jan 2026
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
February 2026 edition

Change history

Tracked from the February 2026 edition to the August 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

  • September 2026 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode

No change to any detail QueueWatch tracks.

Also at COWLEY GSP

GSP view

72 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 2.0 GW: 0.4 GW connected, 1.6 GW accepted to connect.

See all 72

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?