QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.
Distribution / Sites / Customer

CONRAD ENERGY (DEVELOPMENTS) II LIMITED

Customer named in the DNOs’ registers

In UKPN’s November 2026, NGED’s August 2026, SSEN’s November 2026, SPEN’s September 2026 and ENWL’s October 2026 editions

The registers spell this customer’s name more than one way: “CONRAD ENERGY (DEVELOPMENTS) II LIMITED” (8 sites), “Conrad energy (developments) ii limited” (5 sites), “Conrad Energy (Developments) II Limited” (2 sites), “Conrad Energy (Developments) II Ltd” (1 site), “Conrad energy (developments) ii ltd” (1 site) and “conrad energy (developments) ii limited” (1 site).

18sites of 1 MW and over
729 MWcapacity
–connected (0 sites)
729 MWaccepted to connect (18 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNNovember 2026 edition118 MW–18 MW
NGEDAugust 2026 edition7336 MW–336 MW
SSENNovember 2026 edition7290 MW–290 MW
SPENSeptember 2026 edition260.6 MW–60.6 MW
ENWLOctober 2026 edition124.2 MW–24.2 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Storage8472 MW–472 MW
Solar8232 MW–232 MW
Gas and other fossil118 MW–18 MW
Other or not stated17 MW–7 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs’ latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Bullymores lodgeNGEDGrendon 132Kv S StnStorageAccepted to connect99
FAWLEY BATTERY ENERGY STORAGE PLANTSSENFAWLEY GSPStorageAccepted to connect99
Land at armshead farm, ref cellarhead bessNGEDCellarhead 132KvStorageAccepted to connect99
Ellbridge farmNGEDLandulph SgpSolarAccepted to connect49.92
TRUNCHEAUNTS FARMSSENBRAMLEY (FLEE)SolarAccepted to connect49.92
WICKHAM PV PLANTSSENBOTLEY WOOD GSPSolarAccepted to connect49.92
Ellbridge farm, landulph energy storage plantNGEDLandulph SgpStorageAccepted to connect49.9
NORTH LEYLODGESSENKINTOREStorageAccepted to connect49.9
Coldstream Solar PV Plant (Elwartlaw Farm)SPENEcclesSolarAccepted to connect40.56
25.3MW BATTERYSSENMELKSHAM GSPStorageAccepted to connect25.3

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
Landulph SgpNGED2–99.8 MW
Cellarhead 132KvNGED1–99 MW
FAWLEY GSPSSEN1–99 MW
Grendon 132Kv S StnNGED1–99 MW
BOTLEY WOOD GSPSSEN1–49.9 MW
BRAMLEY (FLEE)SSEN1–49.9 MW
KINTORESSEN1–49.9 MW
EcclesSPEN1–40.6 MW
MELKSHAM GSPSSEN1–25.3 MW
Staythorpe C 132Kv S StnNGED1–25.3 MW

What changed recently

Changes to its sites found in both editions of each pair, newest first.

UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 1 site matched. Every October site and every November site had a match in the other edition.

Tracking NGED’s register since its August 2026 edition. Changes will show from its next edition.

SSEN, October 2026 edition to November 2026 edition, for this customer’s sites: 7 sites matched. Every October site and every November site had a match in the other edition.

SPEN, August 2026 edition to September 2026 edition, for this customer’s sites: 2 sites matched. Every August site and every September site had a match in the other edition.

ENWL, September 2026 edition to October 2026 edition, for this customer’s sites: 1 site matched. Every September site and every October site had a match in the other edition.

No change to any detail QueueWatch tracks for its sites so far.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?