QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

FAWLEY BATTERY ENERGY STORAGE PLANT

CONRAD ENERGY (DEVELOPMENTS) II LIMITED at FAWLEY GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Oct 2038
Status
Accepted to connect
Customer
CONRAD ENERGY (DEVELOPMENTS) II LIMITED
Site name
FAWLEY BATTERY ENERGY STORAGE PLANT
Address
FAWLEY BATTERY ENERGY STORAGE PLANT, ASHLETT ROAD, SOUTHAMPTON, HAMPSHIRE, SO45 1DT
Grid reference
Easting 446543, northing 103212
Licence area
Southern England (SEPD)
Grid supply point
FAWLEY GSP
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 99 MW registered
Registered capacity
99 MW
Change to maximum export capacity
99 MW
Change to maximum import capacity
109.696 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
28 Oct 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2025 edition
    Target energisation date stated as 31 Oct 2038 (not stated in the October 2025 edition)

Also at FAWLEY GSP

GSP view

26 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 692 MW: 473 MW connected, 219 MW accepted to connect.

See all 26

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?