BRAMLEY (FLEE)
Grid supply point in Southern England (SEPD)
SSEN Embedded Capacity Register, November 2026 edition
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Solar | 42 | 778 MW | 196 MW | 582 MW |
| Other or not stated | 9 | 432 MW | 85 MW | 347 MW |
| Storage | 7 | 383 MW | 120 MW | 263 MW |
| Bioenergy and waste | 7 | 29.1 MW | 17.3 MW | 11.8 MW |
| Gas and other fossil | 3 | 17.8 MW | 17.8 MW | – |
Storage capacity in MWh: not published by SSEN.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | ||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| COXMOOR WOOD | 2 | 49.9 MW | 22 MW | |||||||||||||||||||||||||||||||
2 sites, 71.9 MW: 49.9 MW connected, 22 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| COXMOOR WOOD | 1 | 4.8 MW | – | |||||||||||||||||||||||||||||||
1 site, 4.8 MW: 4.8 MW connected
| ||||||||||||||||||||||||||||||||||
| COXMOOR WOOD | 1 | 4.1 MW | – | |||||||||||||||||||||||||||||||
1 site, 4.1 MW: 4.1 MW connected
| ||||||||||||||||||||||||||||||||||
| COXMOOR WOOD | 1 | 4 MW | – | |||||||||||||||||||||||||||||||
1 site, 4 MW: 4 MW connected
| ||||||||||||||||||||||||||||||||||
| COXMOOR WOOD | 1 | 1.1 MW | – | |||||||||||||||||||||||||||||||
1 site, 1.1 MW: 1.1 MW connected
| ||||||||||||||||||||||||||||||||||
| COXMOOR WOOD | 3 | – | 169 MW | |||||||||||||||||||||||||||||||
3 sites, 169 MW: 169 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| BURGHFIELD RESERVE | 3 | 1.6 MW | 24.3 MW | |||||||||||||||||||||||||||||||
3 sites, 25.9 MW: 1.6 MW connected, 24.3 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| BURGHFIELD RESERVE | 1 | 6.8 MW | – | |||||||||||||||||||||||||||||||
1 site, 6.8 MW: 6.8 MW connected
| ||||||||||||||||||||||||||||||||||
| BURGHFIELD RESERVE | 1 | – | 5 MW | |||||||||||||||||||||||||||||||
1 site, 5 MW: 5 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| BURGHFIELD RESERVE | 1 | – | 2.3 MW | |||||||||||||||||||||||||||||||
1 site, 2.3 MW: 2.3 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| BURGHFIELD RESERVE | 1 | – | 1.2 MW | |||||||||||||||||||||||||||||||
1 site, 1.2 MW: 1.2 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| BURGHFIELD RESERVE | 5 | – | 156 MW | |||||||||||||||||||||||||||||||
5 sites, 156 MW: 156 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| ALTON | 1 | 12.4 MW | – | |||||||||||||||||||||||||||||||
1 site, 12.4 MW: 12.4 MW connected
| ||||||||||||||||||||||||||||||||||
| ALTON | 1 | 9.5 MW | – | |||||||||||||||||||||||||||||||
1 site, 9.5 MW: 9.5 MW connected
| ||||||||||||||||||||||||||||||||||
| ALTON | 1 | 7.5 MW | – | |||||||||||||||||||||||||||||||
1 site, 7.5 MW: 7.5 MW connected
| ||||||||||||||||||||||||||||||||||
| ALTON | 2 | 6.7 MW | – | |||||||||||||||||||||||||||||||
2 sites, 6.7 MW: 6.7 MW connected
| ||||||||||||||||||||||||||||||||||
| ALTON | 1 | – | 5.4 MW | |||||||||||||||||||||||||||||||
1 site, 5.4 MW: 5.4 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| ALTON | 1 | 4.8 MW | – | |||||||||||||||||||||||||||||||
1 site, 4.8 MW: 4.8 MW connected
| ||||||||||||||||||||||||||||||||||
| ALTON | 2 | – | 74 MW | |||||||||||||||||||||||||||||||
2 sites, 74 MW: 74 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| BRAMLEY | 1 | 99.9 MW | – | |||||||||||||||||||||||||||||||
1 site, 99.9 MW: 99.9 MW connected
| ||||||||||||||||||||||||||||||||||
| FERNHURST | 1 | – | 36 MW | |||||||||||||||||||||||||||||||
1 site, 36 MW: 36 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| FERNHURST | 1 | 20.4 MW | – | |||||||||||||||||||||||||||||||
1 site, 20.4 MW: 20.4 MW connected
| ||||||||||||||||||||||||||||||||||
| FERNHURST | 1 | 7.9 MW | – | |||||||||||||||||||||||||||||||
1 site, 7.9 MW: 7.9 MW connected
| ||||||||||||||||||||||||||||||||||
| FERNHURST | 1 | 4.8 MW | – | |||||||||||||||||||||||||||||||
1 site, 4.8 MW: 4.8 MW connected
| ||||||||||||||||||||||||||||||||||
| FERNHURST | 1 | 3.9 MW | – | |||||||||||||||||||||||||||||||
1 site, 3.9 MW: 3.9 MW connected
| ||||||||||||||||||||||||||||||||||
| FERNHURST | 1 | – | 2 MW | |||||||||||||||||||||||||||||||
1 site, 2 MW: 2 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| FERNHURST | 1 | – | 20 MW | |||||||||||||||||||||||||||||||
1 site, 20 MW: 20 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| READING | 1 | – | 20 MW | |||||||||||||||||||||||||||||||
1 site, 20 MW: 20 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| READING | 1 | – | 19 MW | |||||||||||||||||||||||||||||||
1 site, 19 MW: 19 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| READING | 1 | 14.3 MW | – | |||||||||||||||||||||||||||||||
1 site, 14.3 MW: 14.3 MW connected
| ||||||||||||||||||||||||||||||||||
| READING | 1 | 14 MW | – | |||||||||||||||||||||||||||||||
1 site, 14 MW: 14 MW connected
| ||||||||||||||||||||||||||||||||||
| READING | 1 | 3.9 MW | – | |||||||||||||||||||||||||||||||
1 site, 3.9 MW: 3.9 MW connected
| ||||||||||||||||||||||||||||||||||
| READING | 2 | 1.1 MW | 1 MW | |||||||||||||||||||||||||||||||
2 sites, 2.1 MW: 1.1 MW connected, 1 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| BURGHFIELD BSP | 1 | 47.4 MW | – | |||||||||||||||||||||||||||||||
1 site, 47.4 MW: 47.4 MW connected
| ||||||||||||||||||||||||||||||||||
| BRACKNELL MAIN | 1 | 19 MW | – | |||||||||||||||||||||||||||||||
1 site, 19 MW: 19 MW connected
| ||||||||||||||||||||||||||||||||||
| BRACKNELL MAIN | 1 | 19 MW | – | |||||||||||||||||||||||||||||||
1 site, 19 MW: 19 MW connected
| ||||||||||||||||||||||||||||||||||
| PYESTOCK | 1 | 15.2 MW | – | |||||||||||||||||||||||||||||||
1 site, 15.2 MW: 15.2 MW connected
| ||||||||||||||||||||||||||||||||||
| PYESTOCK | 1 | 15.2 MW | – | |||||||||||||||||||||||||||||||
1 site, 15.2 MW: 15.2 MW connected
| ||||||||||||||||||||||||||||||||||
| COXMOOR WOOD BSP | 1 | 20 MW | – | |||||||||||||||||||||||||||||||
1 site, 20 MW: 20 MW connected
| ||||||||||||||||||||||||||||||||||
| WOKINGHAM | 1 | – | 20 MW | |||||||||||||||||||||||||||||||
1 site, 20 MW: 20 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| MAIDENHEAD | 1 | – | 17.9 MW | |||||||||||||||||||||||||||||||
1 site, 17.9 MW: 17.9 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| BURGHFIELD MAIN | 1 | 7.6 MW | – | |||||||||||||||||||||||||||||||
1 site, 7.6 MW: 7.6 MW connected
| ||||||||||||||||||||||||||||||||||
| BURGHFIELD MAIN | 2 | 4.3 MW | – | |||||||||||||||||||||||||||||||
2 sites, 4.3 MW: 4.3 MW connected
| ||||||||||||||||||||||||||||||||||
| BURGHFIELD MAIN | 1 | – | 1 MW | |||||||||||||||||||||||||||||||
1 site, 1 MW: 1 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| ALDERSHOT | 1 | 2.3 MW | – | |||||||||||||||||||||||||||||||
1 site, 2.3 MW: 2.3 MW connected
| ||||||||||||||||||||||||||||||||||
| ALDERSHOT | 1 | 1.2 MW | – | |||||||||||||||||||||||||||||||
1 site, 1.2 MW: 1.2 MW connected
| ||||||||||||||||||||||||||||||||||
| BRACKNELL RESERVE | 2 | 2.3 MW | 0.8 MW | |||||||||||||||||||||||||||||||
2 sites, 3.1 MW: 2.3 MW connected, 0.8 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Not stated | 2 | – | 156 MW | |||||||||||||||||||||||||||||||
2 sites, 156 MW: 156 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Not stated | 5 | – | 451 MW | |||||||||||||||||||||||||||||||
5 sites, 451 MW: 451 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
Not found among the sites of 1 MW and over in SSEN’s November 2026 edition
1 site last found at this grid supply point was not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode. QueueWatch keeps its page for six months and does not say whether it has left the register.
- 199.9MW last found in the August 2026 edition
Listed at under 1 MW in SSEN’s November 2026 edition
2 sites last listed here at 1 MW or over are listed in this edition at under 1 MW. QueueWatch keeps their pages for six months.
- (AM) 1500KVA LOAD & 800KW PV/300KW EXPORT last found in the October 2026 edition
- ARMY TRAINING REGIMENT last found in the October 2026 edition
What changed recently
Changes to sites here found in both editions of each pair, newest first.
October 2026 edition to November 2026 edition: 67 sites matched. 3 sites at this grid supply point couldn’t be matched between the two editions, because their details changed or they appear in only one.
3 sites without a match in the other edition
In the November 2026 edition only (1)
- Site not namedSouthern England (SEPD)Accepted to connect0.8 MW
In the October 2026 edition only (2)
- (AM) 1500KVA LOAD & 800KW PV/300KW EXPORTSouthern England (SEPD)Accepted to connectListed at under 1 MW in the November 2026 edition0.8 MW
- ARMY TRAINING REGIMENTSouthern England (SEPD)Accepted to connectListed at under 1 MW in the November 2026 edition0.648 MW
- TRINITY FARMNovember 2026 editionExport capacity changed from 100.1 MW to 84.211 MW
- (AM) 1500KVA LOAD & 800KW PV/300KW EXPORTOctober 2026 editionTarget energisation date moved from 4 Jun 2027 to 31 Aug 2027 (3 months later)
- BISHOPS SUTTONOctober 2026 editionExport capacity changed from 0.105 MW to 5.4 MW
- SWECO UK LTDOctober 2026 editionExport capacity changed from 105.6 MW to 104.211 MW
- TRINITY FARMOctober 2026 editionExport capacity changed from 84.211 MW to 100.1 MW
- 9.9MW 33KV POC REQUESTEDSeptember 2026 editionExport capacity changed from 10.421 MW to 9.9 MW
- Site not namedSeptember 2026 editionExport capacity changed from 0.105 MW to 20 MW
- Site not namedSeptember 2026 editionExport capacity changed from 1.789 MW to 11.8 MW
- SWECO UK LTDSeptember 2026 editionExport capacity changed from 104.211 MW to 105.6 MW
- ARBORFIELD PVAugust 2026 editionCapacity changed from 10.45 MW to 13.999 MW
- ARBORFIELD PVAugust 2026 editionExport capacity changed from 10.45 MW to 13.999 MW
- 9.9MW 33KV POC REQUESTEDJuly 2026 editionExport capacity changed from 9.9 MW to 10.421 MW
- BISHOPS SUTTONJuly 2026 editionExport capacity changed from 5.4 MW to 0.105 MW
- Site not namedJuly 2026 editionExport capacity changed from 20 MW to 0.105 MW
- SOUTHWOOD FARMJuly 2026 editionExport capacity changed from 0.105 MW to 30 MW
- TRINITY FARMJuly 2026 editionExport capacity changed from 100.1 MW to 84.211 MW
- 9.9MW 33KV POC REQUESTEDJune 2026 editionExport capacity changed from 10.421 MW to 9.9 MW
- BISHOPS SUTTONJune 2026 editionExport capacity changed from 0.105 MW to 5.4 MW
- Site not namedJune 2026 editionExport capacity changed from 0.105 MW to 20 MW
- TRINITY FARMJune 2026 editionExport capacity changed from 84.211 MW to 100.1 MW
- BISHOPS SUTTONMay 2026 editionExport capacity changed from 5.4 MW to 0.105 MW
- Site not namedMay 2026 editionExport capacity changed from 20 MW to 0.105 MW
- TRINITY FARMMay 2026 editionExport capacity changed from 100.1 MW to 84.211 MW
- 9.9MW 33KV POC REQUESTEDApril 2026 editionExport capacity changed from 9.9 MW to 10.421 MW
- BISHOPS SUTTONApril 2026 editionExport capacity changed from 0.105 MW to 5.4 MW
- SOUTHWOOD FARMApril 2026 editionExport capacity changed from 30 MW to 0.105 MW
- TRINITY FARMApril 2026 editionExport capacity changed from 84.211 MW to 100.1 MW
- BISHOPS SUTTONFebruary 2026 editionExport capacity changed from 4.75 MW to 0.105 MW
- Site not namedFebruary 2026 editionExport capacity changed from 11.8 MW to 1.789 MW
- TRINITY FARMFebruary 2026 editionExport capacity changed from 99.9 MW to 84.211 MW
- 199.9MWDecember 2025 editionCustomer not stated (name not shown in the November 2025 edition)
- JBM SOLAR PROJECTS 18 LTDOctober 2025 editionCustomer changed from AMBERSIDE ENERGY LTD to JBM SOLAR PROJECTS 18 LTD
- JBM SOLAR PROJECTS 18 LTDOctober 2025 editionStatus changed from “accepted to connect” to “connected”
- GORING POWER IMPORTJuly 2025 editionCapacity changed from 7.12 MW to 6.764 MW
- GORING POWER IMPORTJuly 2025 editionExport capacity changed from 0 MW to 6.764 MW
- HERRIARD AD PLANTJuly 2025 editionTechnology stated as Bioenergy and waste (not stated in the June 2025 edition)
- REDCENTRIC SOLUTIONSJuly 2025 editionTechnology stated as Gas and other fossil (not stated in the June 2025 edition)
- Site not namedJuly 2025 editionTechnology stated as Gas and other fossil (not stated in the June 2025 edition)
- SOUTHWOOD FARMJuly 2025 editionCustomer not stated (name not shown in the June 2025 edition)
- TILLINGHAM POWERJuly 2025 editionTechnology stated as Gas and other fossil (not stated in the June 2025 edition)
- GORING POWER IMPORTMay 2025 editionCapacity changed from 6.764 MW to 7.12 MW
- GORING POWER IMPORTMay 2025 editionExport capacity changed from 6.764 MW to 0 MW
- INFINISApril 2025 editionTechnology stated as Bioenergy and waste (not stated in the March 2025 edition)
- MANOR FARMDecember 2024 editionCapacity changed from 43.975 MW to 63.975 MW
- MANOR FARMDecember 2024 editionExport capacity changed from 43.975 MW to 44 MW
- FIVE OAKS SOLAR FARM LIMITEDNovember 2023 editionCapacity changed from 5.263 MW to 3.905 MW
- HUNGERFORD FARM PVNovember 2023 editionCapacity stated as 4.75 MW (not stated in the October 2023 edition)
- HUNGERFORD FARM PVNovember 2023 editionCapacity changed from 1.2 MW to 1.14 MW
- OAKFIELD FARM PVNovember 2023 editionCapacity changed from 4.484 MW to 4.047 MW
- STUD FARMNovember 2023 editionCapacity changed from 8 MW to 7.6 MW
- TILLINGHAM POWERNovember 2023 editionCapacity changed from 16.842 MW to 15.2 MW
- UK POWER RESERVE WESTERN ROADNovember 2023 editionCapacity changed from 20 MW to 19 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.