Distribution / Northern Powergrid / Grid supply point

Keadby

Grid supply point in Yorkshire (Northern Powergrid)

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

69sites of 1 MW and over
2.5 GWcapacity
0.6 GWconnected (32 sites)
1.9 GWaccepted to connect (37 sites)

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Storage10867 MW52 MW815 MW
Solar31859 MW105 MW754 MW
Wind10404 MW133 MW271 MW
Gas and other fossil9205 MW201 MW4 MW
Bioenergy and waste8138 MW75 MW63 MW
Other or not stated11.1 MW1.1 MW–

Storage capacity: 4 sites here state 627 MWh, 627 MWh accepted to connect.

Each site is grouped by its first energy source, as the register names it.

How busy is each primary substation?

Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Primary substationBulk supply pointSitesConnectedAccepted to connect
Elm Tree Hybrid1–395 MW
Scunthorpe North1–80 MW
Scunthorpe North1–36 MW
Scunthorpe North1–32 MW
Scunthorpe North1–30 MW
Scunthorpe North120 MW–
Scunthorpe North116.2 MW–
Scunthorpe North116 MW–
Scunthorpe North112.2 MW–
Scunthorpe North14.6 MW–
Scunthorpe North1–1.7 MW
Scunthorpe North11 MW–
Santon Solar Farm1–200 MW
Scawby Brook297.9 MW–
Scawby Brook1–79.9 MW
Santon140 MW–
Santon1–20 MW
Santon1–20 MW
Santon32.4 MW11.4 MW
Santon1–13 MW
Santon35.5 MW3.5 MW
Santon18 MW–
Santon1–5 MW
Santon1–1 MW
Broughton1123 MW–
Wold Newton317 MW15 MW
Wold Newton1–30 MW
Wold Newton120 MW–
Wold Newton18 MW–
Wold Newton17.5 MW–
Wold Newton15 MW–
Keadby BESS1–99 MW
Ludborough Solar Farm1–98 MW
Haldenby Moor Wind Farm1–96 MW
Scunthorpe South135 MW–
Scunthorpe South134.3 MW–
Scunthorpe South1–20 MW
Scunthorpe South1–1.7 MW
Vox Winterton BESS1–80 MW
Keadby1–50 MW
Keadby1–30 MW
Keadby Windfarm168 MW–
Blyton1–30 MW
Blyton414.4 MW–
Blyton1–8 MW
Blyton47 MW–
Blyton24.4 MW–
HRS Biomass1–63 MW
Lower Trent Wind Farm1–58.3 MW
North Moor Wind Farm1–50.4 MW
Caistor Solar1–49.9 MW
Chapel Lane PV1–49.9 MW
Grasby BESS1–49.9 MW
Keadby Grid BESS1–49.9 MW
Messingham Solar Park1–49.9 MW

Search and filter all 69 sites at Keadby

Not found among the sites of 1 MW and over in Northern Powergrid’s November 2026 edition

5 sites last found at this grid supply point were not found among this edition’s sites of 1 MW and over by their MPAN, grid reference or name and postcode. QueueWatch keeps their pages for six months and does not say whether they have left the register.

What changed recently

Changes to sites here found in both editions of each pair, newest first.

October 2026 edition to November 2026 edition: 67 sites matched. 2 sites at this grid supply point couldn’t be matched between the two editions, because their details changed or they appear in only one.

2 sites without a match in the other edition
In the November 2026 edition only (2)
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

How power reaches a site

A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.