Warren Lane Photovoltaic

Warren Lane Photovoltaic at Keadby

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Warren Lane Photovoltaic
Site name
Warren Lane Photovoltaic
Address
Warren Solar Park, Normanby Road, Scunthorpe, Lincolnshire, DN15 9BF
Grid reference
Easting 493177, northing 418528
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Keadby
Bulk supply point
Scunthorpe North
Primary substation
Warren Solar
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 40 MW registered
Energy source 2
Solar, Photovoltaic: 40 MW registered
Registered capacity
80 MW
Change to maximum export capacity
80 MW
Change to maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
1 Oct 2014
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
9 Jun 2026
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

  • June 2026 edition
    Capacity changed from 38 MW to 80 MW
  • June 2026 edition
    Technology changed from Solar to Storage

Also at Keadby

GSP view

65 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 2.4 GW: 0.6 GW connected, 1.8 GW accepted to connect.

  • Elm Tree Solar Wind & BESSElm Tree Solar Wind & BESS, Storage, Elm Tree Hybrid Direct primaryAccepted394.6 MW
  • Santon Solar FarmSanton Solar Farm, Solar, Santon Solar Farm Direct primaryAccepted199.8 MW
  • TATA SteelTATA Steel, Gas and other fossil, Broughton Direct primaryConnected123.3 MW
  • Keadby BESSKeadby BESS, Storage, Keadby BESS Direct primaryAccepted99 MW
  • Ludborough Solar FarmLudborough Solar Farm, Solar, Ludborough Solar Farm Direct primaryAccepted98 MW
  • Haldenby Moor Wind FarmHaldenby Moor Wind Farm, Wind, Haldenby Moor Wind Farm Direct primaryAccepted96 MW
  • Vox Winterton BESSVox Winterton BESS, Storage, Vox Winterton BESS Direct primaryAccepted80 MW
  • Scawby Brook EnergyScawby Brook Energy, Solar, Scawby Brook Energy primaryAccepted79.9 MW

See all 65

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose