Haldenby Moor Wind Farm
Haldenby Moor Wind Farm at Keadby
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Haldenby Moor Wind Farm
- Site name
- Haldenby Moor Wind Farm
- Address
- Haldenby Moor Wind Farm, Haldenby Moor, Scunthorpe, Lincolnshire, DN17 4PE
- Grid reference
- Easting 480820, northing 417928
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Keadby
- Bulk supply point
- Haldenby Moor Wind Farm
- Primary substation
- Haldenby Moor Wind Farm Direct
- Connection voltage
- 132 kV
- Technology group
- Wind
- Energy source 1
- Wind, Onshore wind turbines: 96 MW registered
- Registered capacity
- 96 MW
- Change to maximum export capacity
- 96 MW
- Change to maximum import capacity
- 0.142 MW
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 29 Dec 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 12 Jan 2026
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Keadby
GSP view68 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 2.5 GW: 0.6 GW connected, 1.9 GW accepted to connect.
- Elm Tree Solar Wind & BESSElm Tree Solar Wind & BESS, Storage, Elm Tree Hybrid Direct primaryAccepted394.6 MW
- Ludborough Solar FarmLudborough Solar Farm, Solar, Ludborough Solar Farm Direct primaryAccepted98 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?