Hall Water Treatment Works

Hall Water Treatment Works at Keadby

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
15 Apr 2014
Status
Connected
Customer
Hall Water Treatment Works
Site name
Hall Water Treatment Works
Address
Hall W.T.W, Collingham Road, Lincoln, Lincolnshire, LN1 2LL
Grid reference
Easting 483124, northing 373939
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Keadby
Bulk supply point
Blyton
Primary substation
Stow
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Steam turbine (thermal power plant): 1.596 MW registered
Registered capacity
1.596 MW
Maximum export capacity
0.8 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
Not stated
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
2394000111698
Import MPAN
Not stated
Last updated
8 Mar 2017
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Keadby

GSP view

68 other sites at this grid supply point in the November 2026 edition, 3 of them at Stow, the same primary substation. In all, the sites here total 2.5 GW: 0.6 GW connected, 1.9 GW accepted to connect.

  • Stow Park RoadDanes Farm Solar Farm, Solar, Stow primaryConnected8.55 MW
  • Newton on Trent Water WorksNewton on Trent Water Works, Gas and other fossil, Stow primaryConnected3.1 MW
  • Stow Park RoadStow Solar Farm, Solar, Stow primaryConnected1.188 MW
  • Elm Tree Solar Wind & BESSElm Tree Solar Wind & BESS, Storage, Elm Tree Hybrid Direct primaryAccepted394.6 MW
  • Santon Solar FarmSanton Solar Farm, Solar, Santon Solar Farm Direct primaryAccepted199.8 MW
  • TATA SteelTATA Steel, Gas and other fossil, Broughton Direct primaryConnected123.3 MW
  • Keadby BESSKeadby BESS, Storage, Keadby BESS Direct primaryAccepted99 MW
  • Ludborough Solar FarmLudborough Solar Farm, Solar, Ludborough Solar Farm Direct primaryAccepted98 MW

See all 68

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?