QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Fen Farm Wind Farm

Fen Farm Wind Farm at Keadby

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
11 Jun 2011
Status
Connected
Customer
Fen Farm Wind Farm
Site name
Fen Farm Wind Farm
Address
Wind Farm 1, Fen Lane, Conisholme Louth, Lincolnshire, LN11 7LU
Grid reference
Easting 539639, northing 395661
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Keadby
Bulk supply point
Wold Newton
Primary substation
Fen Farm Windfarm
Connection voltage
33 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 16 MW registered
Energy source 2
Solar, Photovoltaic: 1.06 MW registered
Registered capacity
17 MW
Maximum export capacity
17 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
Not stated
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
2394000047581
Import MPAN
2394000047590
Last updated
19 Dec 2024
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Keadby

GSP view

68 other sites at this grid supply point in the November 2026 edition, 2 of them at Fen Farm Windfarm, the same primary substation. In all, the sites here total 2.5 GW: 0.6 GW connected, 1.9 GW accepted to connect.

  • Fen Farm Phase 2 PVFen Farm Phase 2 PV, Solar, Fen Farm Windfarm primaryAccepted9 MW
  • Fen FarmFen Farm Wind Farm Phase 3, Solar, Fen Farm Windfarm primaryAccepted6 MW
  • Elm Tree Solar Wind & BESSElm Tree Solar Wind & BESS, Storage, Elm Tree Hybrid Direct primaryAccepted394.6 MW
  • Santon Solar FarmSanton Solar Farm, Solar, Santon Solar Farm Direct primaryAccepted199.8 MW
  • TATA SteelTATA Steel, Gas and other fossil, Broughton Direct primaryConnected123.3 MW
  • Keadby BESSKeadby BESS, Storage, Keadby BESS Direct primaryAccepted99 MW
  • Ludborough Solar FarmLudborough Solar Farm, Solar, Ludborough Solar Farm Direct primaryAccepted98 MW
  • Haldenby Moor Wind FarmHaldenby Moor Wind Farm, Wind, Haldenby Moor Wind Farm Direct primaryAccepted96 MW

See all 68

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?