Severn trent water limited
Customer named in the DNOs' registers
In NGED's August 2026 edition
The registers spell this customer’s name more than one way: “Severn trent water limited” (17 sites), “Severn trent water” (1 site) and “Severn trent water ltd” (1 site).
Capacity by DNO
| DNO | Edition | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|---|
| NGED | August 2026 edition | 19 | 54.2 MW | 52.2 MW | 2 MW |
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Bioenergy and waste | 10 | 31.7 MW | 31.7 MW | – |
| Gas and other fossil | 4 | 13.7 MW | 13.7 MW | – |
| Solar | 4 | 7.7 MW | 5.7 MW | 2 MW |
| Other or not stated | 1 | 1.2 MW | 1.2 MW | – |
Each site is grouped by its first energy source, as the register names it.
Sites
Each site under this name in the DNOs' latest editions, the largest first.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
Grid supply points
Each grid supply point its sites are at, with the capacity of its own sites there.
| Grid supply point | DNO | Sites | Connected | Accepted to connect |
|---|---|---|---|---|
| Nechells East 132Kv S Stn | NGED | 1 | 11.9 MW | – |
| Port Ham 132Kv S Stn | NGED | 2 | 10 MW | – |
| Stoke Bardolph 132Kv | NGED | 1 | 6.4 MW | – |
| Cellarhead 132Kv | NGED | 3 | 4.3 MW | 2 MW |
| Penn 132Kv S Stn | NGED | 2 | 5.2 MW | – |
| Willington 132Kv S Stn | NGED | 2 | 3.4 MW | – |
| Ratcliffe On Soar 132Kv S Stn | NGED | 2 | 2.7 MW | – |
| Drakelow 132Kv | NGED | 1 | 1.9 MW | – |
| Lea Marston 132Kv S Stn | NGED | 1 | 1.7 MW | – |
| Bishops Wood 132Kv S Stn | NGED | 1 | 1.5 MW | – |
| Enderby 132Kv S Stn | NGED | 1 | 1.2 MW | – |
| Shrewsbury 132Kv S Stn | NGED | 1 | 1.1 MW | – |
| Coventry 132Kv S Stn | NGED | 1 | 1 MW | – |
What changed recently
Changes to its sites found in both of two consecutive monthly editions of their DNO's register, the latest first.
NGED: QueueWatch holds one edition of its register so far, the August 2026 edition, so there is nothing to compare yet.
No change to the status, capacity, technology or customer of its sites in the editions QueueWatch holds.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose