QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Rushmoor sewage treatment works

Severn trent water ltd at Shrewsbury 132Kv S Stn

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Oct 2017
Status
Connected
Customer
Severn trent water ltd
Site name
Rushmoor sewage treatment works
Address
Rushmoor Sewage Works, From Access To Lawn Farm To Sewage Works, Rushmoor, Telford, Shropshire, TF6 5EX
Grid reference
Easting 361730, northing 313312
Licence area
West Midlands
Grid supply point
Shrewsbury 132Kv S Stn
Bulk supply point
Shrewsbury 132/33Kv
Primary substation
Leaton 33 11Kv S Stn
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
Biofuel - Sewage gas, Gas turbine (OCGT): 1.141 MW registered
Registered capacity
1.141 MW
Maximum export capacity
0.855 MW
Maximum import capacity
1.482 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
1460002155902
Import MPAN
1426141000000
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to its status, capacity, technology or customer, newest first.

Changes will show from the next edition.

Also at Shrewsbury 132Kv S Stn

GSP view

16 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 480 MW: 58 MW connected, 422 MW accepted to connect.

See all 16

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose