Spondon water treatment works
Severn trent water limited at Willington 132Kv S Stn
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 3 Feb 2025
- Status
- Connected
- Customer
- Severn trent water limited
- Site name
- Spondon water treatment works
- Address
- Export Pos 2 Severn Trent Water Limited, Megaloughton Lane, Spondon, Derby, DE21 7BR
- Grid reference
- Easting 439134, northing 334864
- Licence area
- East Midlands
- Grid supply point
- Willington 132Kv S Stn
- Bulk supply point
- Spondon B 33Kv S Stn
- Primary substation
- Spondon 11Kv S Stn
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biofuel - Sewage gas, Gas turbine (OCGT): 1.7 MW registered
- Registered capacity
- 1.7 MW
- Maximum export capacity
- 0.499 MW
- Maximum import capacity
- 2.518 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 1170002251580
- Import MPAN
- 1100050544271
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Willington 132Kv S Stn
GSP view38 other sites at this grid supply point in the August 2026 edition, 1 of them at Spondon 11Kv S Stn, the same primary substation. In all, the sites here total 665 MW: 167 MW connected, 498 MW accepted to connect.
- Spondon water treatment worksSevern trent water limited, Bioenergy and waste, Spondon 11Kv S Stn primaryConnected1.7 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?