Tittesworth reservoir
Severn trent water limited at Cellarhead 132Kv
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Dec 2012
- Status
- Connected
- Customer
- Severn trent water limited
- Site name
- Tittesworth reservoir
- Address
- Severn Trent Water Limited Tittesworth Reservoir, Buxton Road, Leek, Staffordshire, ST13 8TQ
- Grid reference
- Easting 399424, northing 358442
- Licence area
- West Midlands
- Grid supply point
- Cellarhead 132Kv
- Bulk supply point
- Whitfield 132 33Kv S Stn
- Primary substation
- Leek 33 11Kv S Stn
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Oil, Engine (combustion / reciprocating): 2.261 MW registered
- Registered capacity
- 2.261 MW
- Maximum export capacity
- 1.335 MW
- Maximum import capacity
- 0.855 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 1470000132031
- Import MPAN
- 1427064500006
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to its status, capacity, technology or customer, newest first.
Changes will show from the next edition.
Also at Cellarhead 132Kv
GSP view40 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 1.2 GW: 0.2 GW connected, 1 GW accepted to connect.
- Land at armshead farm, ref cellarhead bessConrad energy (developments) ii limited, StorageAccepted99 MW
- Chatterley whitfield, outclough farm, chatterley whitfield energy storageChatterley energy storage limited, StorageAccepted49.9 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose