DNO CONSULTING LTD

Customer named in the DNOs' registers

In UKPN's October 2026, NGED's August 2026 and SSEN's September 2026 editions

The registers spell this customer’s name more than one way: “DNO CONSULTING LTD” (10 sites), “DNO Consulting Limited” (6 sites), “DNO CONSULTING” (4 sites) and “Dno consulting ltd” (1 site).

21sites of 1 MW and over
795 MWcapacity
182 MWconnected (6 sites)
613 MWaccepted to connect (15 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNOctober 2026 edition6196 MW158 MW38 MW
NGEDAugust 2026 edition199.9 MW–99.9 MW
SSENSeptember 2026 edition14499 MW24 MW475 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar15421 MW82 MW339 MW
Storage5338 MW100 MW238 MW
Bioenergy and waste135.5 MW–35.5 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs' latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Newcombe standalone bessNGEDRugeley 132Kv S StnStorageAccepted to connect99.9
ROW HILL FARMSSENMANNINGTON GSPStorageAccepted to connect99.9
Doublegate LaneUKPNRayleighStorageConnected99.8
MILLTOWN PVSSENELGINSolarAccepted to connect99.8
PARLEY COURT FARMSSENMANNINGTON GSPSolarAccepted to connect50
KIRKTON PV + ESSSSENPETERHEAD GRANGESolarAccepted to connect43.75
FT WOODINGTON FARM PVSSENNURSLING GSPSolarAccepted to connect40
NORTHACRE RESOURCE RECOVERY PLANTSSENMELKSHAM GSPBioenergy and wasteAccepted to connect35.473
PIPPLEPEN FARM SOLAR PVSSENAXMINSTERSolarAccepted to connect32.6
(ANM) Glebe FarmUKPNWalpoleSolarAccepted to connect30

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
MANNINGTON GSPSSEN4–170 MW
RayleighUKPN2115 MW–
Rugeley 132Kv S StnNGED1–99.9 MW
ELGINSSEN1–99.8 MW
WalpoleUKPN223 MW30 MW
MELKSHAM GSPSSEN29.6 MW35.5 MW
PETERHEAD GRANGESSEN1–43.8 MW
NURSLING GSPSSEN1–40 MW
AXMINSTERSSEN1–32.6 MW
ABERNETHYSSEN1–30 MW

What changed recently

Changes to its sites found in both of two consecutive monthly editions of their DNO's register, the latest first.

UKPN, September 2026 edition to October 2026 edition, for this customer's sites: 6 sites matched. Every September site and every October site had a match in the other edition.

NGED: QueueWatch holds one edition of its register so far, the August 2026 edition, so there is nothing to compare yet.

SSEN, August 2026 edition to September 2026 edition, for this customer's sites: 14 sites matched. Every August site and every September site had a match in the other edition.

No change to the status, capacity, technology or customer of its sites in the editions QueueWatch holds.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose