QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

8.55MW BATTERY

DNO CONSULTING LTD at MANNINGTON GSP

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
6 Dec 2036
Status
Accepted to connect
Customer
DNO CONSULTING LTD
Site name
8.55MW BATTERY
Address
TEFFONT, SALISBURY, WILTSHIRE, SP3 5RP
Grid reference
Easting 400015, northing 130776
Licence area
Southern England (SEPD)
Grid supply point
MANNINGTON GSP
Bulk supply point
SALISBURY
Primary substation
TEFFONT
Connection voltage
33 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 8.55 MW registered
Registered capacity
8.55 MW
Change to maximum export capacity
8.55 MW
Change to maximum import capacity
9.474 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
3 Nov 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 38 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at MANNINGTON GSP

GSP view

91 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 1.9 GW: 0.5 GW connected, 1.4 GW accepted to connect.

See all 91

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose