Knaresborough
Grid supply point in North East (Northern Powergrid)
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Solar | 11 | 453 MW | 8 MW | 445 MW |
| Storage | 3 | 186 MW | 76 MW | 110 MW |
| Wind | 2 | 45.2 MW | 15.2 MW | 30 MW |
| Bioenergy and waste | 6 | 38.2 MW | 38.2 MW | – |
| Gas and other fossil | 4 | 33.2 MW | 28.4 MW | 4.8 MW |
Storage capacity in MWh: no site here states any.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | ||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Wormald Green 132/33kV | 1 | 75.5 MW | – | |||||||||||||||||||||||||||||||
1 site, 75.5 MW: 75.5 MW connected
| ||||||||||||||||||||||||||||||||||
| Wormald Green 132/33kV | 1 | – | 40 MW | |||||||||||||||||||||||||||||||
1 site, 40 MW: 40 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Wormald Green 132/33kV | 1 | – | 24 MW | |||||||||||||||||||||||||||||||
1 site, 24 MW: 24 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Wormald Green 132/33kV | 1 | 23.7 MW | – | |||||||||||||||||||||||||||||||
1 site, 23.7 MW: 23.7 MW connected
| ||||||||||||||||||||||||||||||||||
| Wormald Green 132/33kV | 3 | 5.1 MW | 1.1 MW | |||||||||||||||||||||||||||||||
3 sites, 6.2 MW: 5.1 MW connected, 1.1 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Hopewell House | 1 | – | 101 MW | |||||||||||||||||||||||||||||||
1 site, 101 MW: 101 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Low Moor Lane | 1 | – | 99.8 MW | |||||||||||||||||||||||||||||||
1 site, 99.8 MW: 99.8 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Husthwaite | 1 | – | 49.9 MW | |||||||||||||||||||||||||||||||
1 site, 49.9 MW: 49.9 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Husthwaite | 1 | 27 MW | – | |||||||||||||||||||||||||||||||
1 site, 27 MW: 27 MW connected
| ||||||||||||||||||||||||||||||||||
| Husthwaite | 5 | 14.3 MW | 3 MW | |||||||||||||||||||||||||||||||
5 sites, 17.3 MW: 14.3 MW connected, 3 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Husthwaite | 1 | 3.6 MW | – | |||||||||||||||||||||||||||||||
1 site, 3.6 MW: 3.6 MW connected
| ||||||||||||||||||||||||||||||||||
| Coney Garth 94.5MW BESS | 1 | – | 94.5 MW | |||||||||||||||||||||||||||||||
1 site, 94.5 MW: 94.5 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Brafferton Solar Farm | 1 | – | 50 MW | |||||||||||||||||||||||||||||||
1 site, 50 MW: 50 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| High Cayton Solar | 1 | – | 49 MW | |||||||||||||||||||||||||||||||
1 site, 49 MW: 49 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Harrogate 132/33kV | 1 | – | 30 MW | |||||||||||||||||||||||||||||||
1 site, 30 MW: 30 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Harrogate 132/33kV | 1 | 15.2 MW | – | |||||||||||||||||||||||||||||||
1 site, 15.2 MW: 15.2 MW connected
| ||||||||||||||||||||||||||||||||||
| Harrogate 132/33kV | 2 | 1.4 MW | 1.8 MW | |||||||||||||||||||||||||||||||
2 sites, 3.2 MW: 1.4 MW connected, 1.8 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Village Farm Solar | 1 | – | 30 MW | |||||||||||||||||||||||||||||||
1 site, 30 MW: 30 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
| Wormald Green 132/11kV | 1 | – | 16 MW | |||||||||||||||||||||||||||||||
1 site, 16 MW: 16 MW accepted to connect
| ||||||||||||||||||||||||||||||||||
Not found among the sites of 1 MW and over in Northern Powergrid’s November 2026 edition
1 site last found at this grid supply point was not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode. QueueWatch keeps its page for six months and does not say whether it has left the register.
- South West of Station Lane last found in the July 2026 edition
What changed recently
Changes to sites here found in both editions of each pair, newest first.
October 2026 edition to November 2026 edition: 26 sites matched. Every October site and every November site at this grid supply point had a match in the other edition.
- South West of Station LaneJune 2026 editionCapacity changed from 6 MW to 16 MW
- South West of Station LaneJune 2026 editionExport capacity changed from 6 MW to 16 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.