QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Easingwold 2

Easingwold 2 at Knaresborough

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
22 Feb 2016
Status
Connected
Customer
Easingwold 2
Site name
Easingwold 2
Address
Easingwold PV Solar Park Thirsk Road, Easingwold, York, North Yorkshire, YO61 3NJ
Grid reference
Easting 449939, northing 473253
Licence area
North East (Northern Powergrid)
Grid supply point
Knaresborough
Bulk supply point
Husthwaite
Primary substation
Husthwaite 33/11kV
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 4.8 MW registered
Registered capacity
4.8 MW
Maximum export capacity
3.99 MW
Maximum import capacity
0.036 MW
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
Not stated
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
1574000324727
Import MPAN
1580001444836
Last updated
3 Dec 2024
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Knaresborough

GSP view

25 other sites at this grid supply point in the September 2026 edition, 4 of them at Husthwaite 33/11kV, the same primary substation. In all, the sites here total 755 MW: 166 MW connected, 589 MW accepted to connect.

See all 25

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose