Wormald Green Hybrid

Wormald Green Hybrid at Knaresborough

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
18 Sep 2024
Status
Connected
Customer
Wormald Green Hybrid
Site name
Wormald Green Hybrid
Address
Leyton Lees, Mains Lane, Harrogate, North Yorkshire, HG3 3QJ
Grid reference
Easting 432117, northing 465969
Licence area
North East (Northern Powergrid)
Grid supply point
Knaresborough
Bulk supply point
Wormald Green 132/33kV
Primary substation
Leyton Hybrid
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 32.5 MW registered
Energy source 2
Solar, Photovoltaic: 43 MW registered
Registered capacity
75.5 MW
Maximum export capacity
43 MW
Maximum import capacity
31.54 MW
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
29 Jul 2021
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
1574200481341
Import MPAN
1580001832710
Last updated
25 Mar 2025
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Knaresborough

GSP view

25 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 755 MW: 166 MW connected, 589 MW accepted to connect.

See all 25

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose