Alne Landfill
Alne Landfill at Knaresborough
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 25 Apr 2014
- Status
- Connected
- Customer
- Alne Landfill
- Site name
- Alne Landfill
- Address
- Alne Landfill, Forest Lane, York, YO61 1TU
- Grid reference
- Easting 452272, northing 466439
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Knaresborough
- Bulk supply point
- Husthwaite
- Primary substation
- Husthwaite 33/11kV
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Waste, Engine (combustion / reciprocating): 5.51 MW registered
- Registered capacity
- 5.51 MW
- Maximum export capacity
- 5.51 MW
- Maximum import capacity
- 0.475 MW
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 1574000330270
- Import MPAN
- 1580001208250
- Last updated
- 3 Dec 2024
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Knaresborough
GSP view25 other sites at this grid supply point in the November 2026 edition, 4 of them at Husthwaite 33/11kV, the same primary substation. In all, the sites here total 755 MW: 166 MW connected, 589 MW accepted to connect.
- Alne Materials Recycling FacilityExtension to Alne Material Recycling, Gas and other fossil, Husthwaite 33/11kV primaryAccepted3 MW
- Alne Materials Recycling FacilityAlne Material Recycling Facility, Bioenergy and waste, Husthwaite 33/11kV primaryConnected2 MW
- Thormanby Mill Farm WasteThormanby Mill Farm Waste, Bioenergy and waste, Husthwaite 33/11kV primaryConnected2 MW
- Hopewell House Hybrid Solar/BESSHopewell House Hybrid Solar/BESS, Solar, Hopewell House Direct primaryAccepted100.6 MW
- Coney Garth 94.5MW BESSConey Garth 94.5MW BESS, Storage, Coney Garth 94.5MW BESS primaryAccepted94.5 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?