Highfield Farm

Highfield Farm PV at Knaresborough

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Highfield Farm PV
Site name
Highfield Farm
Address
Highfield Farm, York Road, Knaresborough, West Yorkshire, HG5 0SU
Grid reference
Easting 437073, northing 457122
Licence area
North East (Northern Powergrid)
Grid supply point
Knaresborough
Bulk supply point
Wormald Green 132/33kV
Primary substation
Coneythorpe
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 1.126 MW registered
Registered capacity
1.126 MW
Change to maximum export capacity
1.126 MW
Change to maximum import capacity
1.235 MW
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
23 Jun 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
5 Jul 2024
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Knaresborough

GSP view

25 other sites at this grid supply point in the November 2026 edition, 2 of them at Coneythorpe, the same primary substation. In all, the sites here total 755 MW: 166 MW connected, 589 MW accepted to connect.

See all 25

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?