Creyke Beck
Grid supply point in Yorkshire (Northern Powergrid)
Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Solar | 25 | 1.2 GW | 0.1 GW | 1.1 GW |
| Storage | 7 | 312 MW | 210 MW | 102 MW |
| Wind | 16 | 196 MW | 159 MW | 37 MW |
| Gas and other fossil | 11 | 133 MW | 131 MW | 2 MW |
| Bioenergy and waste | 10 | 67.5 MW | 42.3 MW | 25.2 MW |
Storage capacity: 1 site here states 12.4 MWh, 12.4 MWh accepted to connect.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the September 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | ||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Driffield/Beverley Group | 1 | – | 75 MW | |||||||||||||||||||||
1 site, 75 MW: 75 MW accepted to connect
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 1 | – | 62.5 MW | |||||||||||||||||||||
1 site, 62.5 MW: 62.5 MW accepted to connect
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 1 | – | 62.5 MW | |||||||||||||||||||||
1 site, 62.5 MW: 62.5 MW accepted to connect
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 1 | – | 60.7 MW | |||||||||||||||||||||
1 site, 60.7 MW: 60.7 MW accepted to connect
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 1 | 60 MW | – | |||||||||||||||||||||
1 site, 60 MW: 60 MW connected
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 2 | 30 MW | 26 MW | |||||||||||||||||||||
2 sites, 56 MW: 30 MW connected, 26 MW accepted to connect
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 1 | – | 36 MW | |||||||||||||||||||||
1 site, 36 MW: 36 MW accepted to connect
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 1 | – | 35 MW | |||||||||||||||||||||
1 site, 35 MW: 35 MW accepted to connect
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 1 | 30.6 MW | – | |||||||||||||||||||||
1 site, 30.6 MW: 30.6 MW connected
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 2 | 26.3 MW | – | |||||||||||||||||||||
2 sites, 26.3 MW: 26.3 MW connected
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 1 | – | 25.2 MW | |||||||||||||||||||||
1 site, 25.2 MW: 25.2 MW accepted to connect
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 1 | 22 MW | – | |||||||||||||||||||||
1 site, 22 MW: 22 MW connected
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 1 | 13.6 MW | – | |||||||||||||||||||||
1 site, 13.6 MW: 13.6 MW connected
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 2 | 5.2 MW | – | |||||||||||||||||||||
2 sites, 5.2 MW: 5.2 MW connected
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 2 | 3.2 MW | 1.2 MW | |||||||||||||||||||||
2 sites, 4.4 MW: 3.2 MW connected, 1.2 MW accepted to connect
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 1 | 3.9 MW | – | |||||||||||||||||||||
1 site, 3.9 MW: 3.9 MW connected
| ||||||||||||||||||||||||
| Driffield/Beverley Group | 2 | 2.9 MW | – | |||||||||||||||||||||
2 sites, 2.9 MW: 2.9 MW connected
| ||||||||||||||||||||||||
| Creyke Beck Solar | 1 | – | 320 MW | |||||||||||||||||||||
1 site, 320 MW: 320 MW accepted to connect
| ||||||||||||||||||||||||
| Beverley 132/33kV | 1 | – | 49.9 MW | |||||||||||||||||||||
1 site, 49.9 MW: 49.9 MW accepted to connect
| ||||||||||||||||||||||||
| Beverley 132/33kV | 1 | – | 40 MW | |||||||||||||||||||||
1 site, 40 MW: 40 MW accepted to connect
| ||||||||||||||||||||||||
| Beverley 132/33kV | 1 | – | 30.3 MW | |||||||||||||||||||||
1 site, 30.3 MW: 30.3 MW accepted to connect
| ||||||||||||||||||||||||
| Beverley 132/33kV | 1 | 24.1 MW | – | |||||||||||||||||||||
1 site, 24.1 MW: 24.1 MW connected
| ||||||||||||||||||||||||
| Beverley 132/33kV | 1 | 12 MW | – | |||||||||||||||||||||
1 site, 12 MW: 12 MW connected
| ||||||||||||||||||||||||
| Beverley 132/33kV | 1 | 10 MW | – | |||||||||||||||||||||
1 site, 10 MW: 10 MW connected
| ||||||||||||||||||||||||
| Beverley 132/33kV | 2 | 6.5 MW | – | |||||||||||||||||||||
2 sites, 6.5 MW: 6.5 MW connected
| ||||||||||||||||||||||||
| Beverley 132/33kV | 2 | 2.8 MW | 2.1 MW | |||||||||||||||||||||
2 sites, 4.9 MW: 2.8 MW connected, 2.1 MW accepted to connect
| ||||||||||||||||||||||||
| Beverley 132/33kV | 2 | 1.8 MW | 1 MW | |||||||||||||||||||||
2 sites, 2.8 MW: 1.8 MW connected, 1 MW accepted to connect
| ||||||||||||||||||||||||
| Beverley 132/33kV | 1 | – | 2.5 MW | |||||||||||||||||||||
1 site, 2.5 MW: 2.5 MW accepted to connect
| ||||||||||||||||||||||||
| Beverley 132/33kV | 1 | 2 MW | – | |||||||||||||||||||||
1 site, 2 MW: 2 MW connected
| ||||||||||||||||||||||||
| Beverley 132/33kV | 1 | 2 MW | – | |||||||||||||||||||||
1 site, 2 MW: 2 MW connected
| ||||||||||||||||||||||||
| Kenley House Generation Hub | 2 | – | 180 MW | |||||||||||||||||||||
2 sites, 180 MW: 180 MW accepted to connect
| ||||||||||||||||||||||||
| Hall Ings Farm | 1 | – | 100 MW | |||||||||||||||||||||
1 site, 100 MW: 100 MW accepted to connect
| ||||||||||||||||||||||||
| Burn Park Farm | 2 | 99.8 MW | – | |||||||||||||||||||||
2 sites, 99.8 MW: 99.8 MW connected
| ||||||||||||||||||||||||
| Pillswood Battery Farm | 1 | 49.9 MW | – | |||||||||||||||||||||
1 site, 49.9 MW: 49.9 MW connected
| ||||||||||||||||||||||||
| Pillswood Battery Farm | 1 | 49.9 MW | – | |||||||||||||||||||||
1 site, 49.9 MW: 49.9 MW connected
| ||||||||||||||||||||||||
| Bransholme | 1 | – | 41 MW | |||||||||||||||||||||
1 site, 41 MW: 41 MW accepted to connect
| ||||||||||||||||||||||||
| Bransholme | 1 | 23.8 MW | – | |||||||||||||||||||||
1 site, 23.8 MW: 23.8 MW connected
| ||||||||||||||||||||||||
| Bransholme | 1 | 21 MW | – | |||||||||||||||||||||
1 site, 21 MW: 21 MW connected
| ||||||||||||||||||||||||
| Bransholme | 1 | 8.2 MW | – | |||||||||||||||||||||
1 site, 8.2 MW: 8.2 MW connected
| ||||||||||||||||||||||||
| Creyke Beck | 1 | – | 80 MW | |||||||||||||||||||||
1 site, 80 MW: 80 MW accepted to connect
| ||||||||||||||||||||||||
| Hull West | 2 | 4.6 MW | 24 MW | |||||||||||||||||||||
2 sites, 28.6 MW: 4.6 MW connected, 24 MW accepted to connect
| ||||||||||||||||||||||||
| Hull West | 3 | – | 14.9 MW | |||||||||||||||||||||
3 sites, 14.9 MW: 14.9 MW accepted to connect
| ||||||||||||||||||||||||
| Hull West | 1 | – | 14 MW | |||||||||||||||||||||
1 site, 14 MW: 14 MW accepted to connect
| ||||||||||||||||||||||||
| Hull West | 3 | 3.6 MW | 2.5 MW | |||||||||||||||||||||
3 sites, 6.1 MW: 3.6 MW connected, 2.5 MW accepted to connect
| ||||||||||||||||||||||||
| Hull West | 1 | 3.8 MW | – | |||||||||||||||||||||
1 site, 3.8 MW: 3.8 MW connected
| ||||||||||||||||||||||||
| Hull West | 1 | 3.2 MW | – | |||||||||||||||||||||
1 site, 3.2 MW: 3.2 MW connected
| ||||||||||||||||||||||||
| Scurf Dyke Solar | 1 | 50 MW | – | |||||||||||||||||||||
1 site, 50 MW: 50 MW connected
| ||||||||||||||||||||||||
| Cleveland Street Generation | 1 | 25 MW | – | |||||||||||||||||||||
1 site, 25 MW: 25 MW connected
| ||||||||||||||||||||||||
| Hull South | 3 | 5.5 MW | 6 MW | |||||||||||||||||||||
3 sites, 11.5 MW: 5.5 MW connected, 6 MW accepted to connect
| ||||||||||||||||||||||||
| Hull South | 2 | 1.2 MW | 1.5 MW | |||||||||||||||||||||
2 sites, 2.7 MW: 1.2 MW connected, 1.5 MW accepted to connect
| ||||||||||||||||||||||||
| Cornwall Street | 1 | 1 MW | – | |||||||||||||||||||||
1 site, 1 MW: 1 MW connected
| ||||||||||||||||||||||||
Not found in Northern Powergrid's September 2026 edition
44 sites last found at this grid supply point were not found in this edition by their MPAN, grid reference or name and postcode. QueueWatch keeps their pages for six months and does not say whether they have left the register.
- Aldbrough Road last found in the August 2026 edition
- Aldbrough Road last found in the August 2026 edition
- Humberfield Recycling Centre BESS last found in the August 2026 edition
- Newport Building last found in the August 2026 edition
- Newport Building last found in the August 2026 edition
- Aldbrough Road last found in the July 2026 edition
- Aldbrough Road last found in the July 2026 edition
- Burn Park Farm Energy Storage last found in the July 2026 edition
- Castle Hill Hospital last found in the July 2026 edition
- Castle Hill Hospital last found in the July 2026 edition
- Hall Ings Farm last found in the July 2026 edition
- Humberfield Recycling Centre BESS last found in the July 2026 edition
- Manor Farm last found in the July 2026 edition
- Melton West Buisness Park Hybrid last found in the July 2026 edition
- Model Farm last found in the July 2026 edition
- Newport Building last found in the July 2026 edition
- Newport Building last found in the July 2026 edition
- Woodhouse Solar Farm last found in the July 2026 edition
- Woodmansey Hybrid last found in the July 2026 edition
- Aldbrough Road last found in the June 2026 edition
- Aldbrough Road last found in the June 2026 edition
- Castle Hill Hospital last found in the June 2026 edition
- Castle Hill Hospital last found in the June 2026 edition
- Newport Building last found in the June 2026 edition
- Newport Building last found in the June 2026 edition
- Aldbrough Road last found in the May 2026 edition
- Aldbrough Road last found in the May 2026 edition
- Castle Hill Hospital last found in the May 2026 edition
- Castle Hill Hospital last found in the May 2026 edition
- Newport Building last found in the May 2026 edition
- Newport Building last found in the May 2026 edition
- Aldbrough Road last found in the April 2026 edition
- Aldbrough Road last found in the April 2026 edition
- Castle Hill Hospital last found in the April 2026 edition
- Castle Hill Hospital last found in the April 2026 edition
- Newport Building last found in the April 2026 edition
- Newport Building last found in the April 2026 edition
- Aldbrough Road last found in the March 2026 edition
- Aldbrough Road last found in the March 2026 edition
- Bradley Renewables PGF last found in the March 2026 edition
- Castle Hill Hospital last found in the March 2026 edition
- Castle Hill Hospital last found in the March 2026 edition
- Newport Building last found in the March 2026 edition
- Newport Building last found in the March 2026 edition
What changed recently
Changes to the sites here found in both of two consecutive monthly editions, the latest first.
August 2026 edition to September 2026 edition: 65 sites matched. 9 sites at this grid supply point couldn't be matched between the two editions, because their details changed or they appear in only one.
- Ashcourt Forster Street WindJuly 2026 editionStatus changed from “accepted to connect” to “connected”
- IDNO Routh40June 2026 editionCapacity changed from 40 MW to 80 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.